WELL · 42-413-00524 · DISTRICT 7
Harris -C- #1
Schleicher County · Toe Nail (Strawn) field · Vertical
Harris -C- #1 (API 42-413-00524) is a well in Schleicher County operated by Williams Oil Company, completed April 23, 1985.
The RRC has issued one drilling permit, issued May 16, 1995, permitted to 5,330 ft.
Completion filings report 7 formation tops, including Wichita-Albany, Wolfcamp, Coleman Junction, Cisco.
No lease production has been reported under this well’s leases.
Operator of record
Midland, TX · P-5 Y, filed Oct 4, 2025 · 177 permits on file · (432) 967-1359
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Williams Oil Company |
| Production reports | Williams Oil Companythrough Dec 2003 |
| Latest permit | Williams Oil CompanyMay 16, 1995 |
- 5,330
- total depth, ft
- 1
- permits on file
- May 16, 1995
- last permit issued
- Apr 23, 1985
- completed
- 0
- cumulative oil, bbl
- 85.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 23, 1985
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harris C G-9-154579 | Toe Nail (Harkey) | Williams Oil Company | 1 | 0 | 85.6K | Jun 1995 – Jul 2026 |
| Harris C G-9-130192 | Toe Nail (Strawn) | Williams Oil Company | 1 | 0 | 13 | Jan 1993 – May 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Southwest Royalties, Inc.Mar 1993 → Mar 1993
- 2Williams Oil CompanyJun 1995 → Dec 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 435653-99 | Recompletion | Williams Oil Company | May 9, 1995 | May 16, 1995 | May 20, 1995 | 5,330 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-130192 | — | — | — | — |
| — | — G-9-154579 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,384 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wichita-AlbanyWICHITA ALBANY | 830 | 1,554 |
| Wolfcamp | 1,810 | 574 |
| Coleman Junction | 1,890 | 494 |
| Cisco | 3,070 | -686 |
| Canyon | 4,450 | -2,066 |
| Harkey Sand | 4,643 | -2,259 |
| Strawn | 5,214 | -2,830 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,626 | 4,640 | Perforated |
| 5,232 | 5,238 | Perforated |
| 5,254 | 5,261 | Perforated |
| 5,302 | 5,308 | Perforated |
| — | 5,214 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 528 | 12.25 | 200 S |
| 5.5 | 5,330 | 7.875 | 375 S |
| 5.5 | 5,330 | — | 650 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 24, 1995 | Jun 22, 1995 | Yes |
| 00 | Jul 12, 1995 | — | — |
| 00 | Oct 18, 1994 | Aug 15, 1994 | — |
| 00 | Apr 10, 1989 | Mar 13, 1989 | — |
| 00 | Apr 4, 1989 | — | — |
| 00 | May 22, 1985 | May 9, 1985 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-413-00524 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-413-00524 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 9.9K
- bbl, all reported
- May 1996
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000081044 | H-1 Injection | Canceled Apr 19, 1999 | 600 | 1,000 | 5,302–5,308 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 9,899(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41300524, documented in the API reference.