WELL · 42-413-00524 · DISTRICT 7

Harris -C- #1

N

Schleicher County · Toe Nail (Strawn) field  · Vertical

Harris -C- #1 (API 42-413-00524) is a well in Schleicher County operated by Williams Oil Company, completed April 23, 1985.

The RRC has issued one drilling permit, issued May 16, 1995, permitted to 5,330 ft.

Completion filings report 7 formation tops, including Wichita-Albany, Wolfcamp, Coleman Junction, Cisco.

No lease production has been reported under this well’s leases.

Operator of record

Williams Oil Company

Midland, TX · P-5 Y, filed Oct 4, 2025 · 177 permits on file · (432) 967-1359

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWilliams Oil Company
Production reportsWilliams Oil Companythrough Dec 2003
Latest permitWilliams Oil CompanyMay 16, 1995
5,330
total depth, ft
1
permits on file
May 16, 1995
last permit issued
Apr 23, 1985
completed
0
cumulative oil, bbl
85.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 23, 1985
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harris C G-9-154579Toe Nail (Harkey)Williams Oil Company1085.6KJun 1995 – Jul 2026
Harris C G-9-130192Toe Nail (Strawn)Williams Oil Company1013Jan 1993 – May 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Southwest Royalties, Inc.Mar 1993 → Mar 1993
  2. 2Williams Oil CompanyJun 1995 → Dec 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
435653-99RecompletionWilliams Oil CompanyMay 9, 1995May 16, 1995May 20, 19955,330

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-130192————
—— G-9-154579————

Formation tops

As filed on W-2/G-1. Subsea from 2,384 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-AlbanyWICHITA ALBANY8301,554
Wolfcamp1,810574
Coleman Junction1,890494
Cisco3,070-686
Canyon4,450-2,066
Harkey Sand4,643-2,259
Strawn5,214-2,830

Perforations

Perforated and open-hole intervals.

FromToType
4,6264,640Perforated
5,2325,238Perforated
5,2545,261Perforated
5,3025,308Perforated
—5,214Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62552812.25200 S
5.55,3307.875375 S
5.55,330—650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 1995Jun 22, 1995Yes
00Jul 12, 1995——
00Oct 18, 1994Aug 15, 1994—
00Apr 10, 1989Mar 13, 1989—
00Apr 4, 1989——
00May 22, 1985May 9, 1985—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
9.9K
bbl, all reported
May 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081044H-1 InjectionCanceled Apr 19, 19996001,0005,302–5,308

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 9,899(-100%)

01K2K3K19951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41300524, documented in the API reference.