TEXAS · WELLS · SCHLEICHER COUNTY · WEST "B" LEASE · API 42-413-10426 · DISTRICT 6E

West B #1

Y

Schleicher County · Cody Bell (Canyon) field · Producing  · Vertical

West B #1 (API 42-413-10426) is a well in Schleicher County operated by Txp Incorporated, completed December 6, 1991 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 17, 2001, permitted to 6,614 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Txp Incorporated on the wellbore schedule.

Its lease has reported 13.3K barrels of oil and 564K mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

TXP Incorporated

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
San Angelo, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 13, 2026
Permits on file
419
Phone
(325) 944-9894

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXP Incorporated
Production reportsTXP, Incorporatedthrough Apr 2026
Latest permitTexaco E & P Inc.Aug 17, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,614
total depth, ft
1
permits on file
Aug 17, 2001
last permit issued
Dec 6, 1991
completed
13.3K
cumulative oil, bbl
564K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 6, 1991
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West "B" G-9-52008Cody Bell (Canyon)TXP, Incorporated113.3K564KJan 1993 – Apr 2026

Gas, mcf lease total

Last 12 months 4,071 · prior 12 1,091(+273%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Oct 2004
  4. 4Diamond S Energy CompanyNov 2004 → Sep 2025
  5. 5TXP, IncorporatedOct 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
512676-99RecompletionTexaco E & P Inc.Aug 17, 2001Aug 17, 2001—6,614

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 6, 1991West B G-9-52008Cody Bell (Canyon)TXP IncorporatedProducing6,614
Jul 1, 1968West -B- G-9-44506Cody Bell (Canyon)Skelly Oil Co.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
6,2566,271Perforated
6,3926,415Perforated
6,3946,408Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7562113.75350 S
4.56,6147.875430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 4, 1992Dec 23, 1991—
00Jan 12, 1984Feb 28, 1972—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41310426, documented in the API reference.