WELL · 42-413-31615 · DISTRICT 7

Enochs-Sada Ellen #2

Y

Schleicher County · Eldorado (Canyon) field · Producing  · Vertical

Enochs-Sada Ellen #2 (API 42-413-31615) is a well in Schleicher County operated by Hilcorp Energy Company, completed February 16, 1987 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 12, 1987, permitted to 6,400 ft.

It was permitted by Regal Development Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wolfcamp, Canyon.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Regal Development Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsOXY USA Inc.through Jan 2014
Latest permitRegal Development Inc.Jan 12, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,400
total depth, ft
1
permits on file
Jan 12, 1987
last permit issued
Feb 16, 1987
completed
0
cumulative oil, bbl
344K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 16, 1987
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Enochs-Sada Ellen G-9-123836Eldorado (Canyon)Hilcorp Energy Company10344KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Regal Development Inc.Jan 1993 → Jul 1996
  2. 2Questa Oil & Gas Co.Aug 1996 → Jan 2000
  3. 3TXP, IncorporatedFeb 2000 → Dec 2003
  4. 4Pogo Producing CompanyJan 2004 → Jan 2008
  5. 5Pogo Producing Company LLCFeb 2008 → Feb 2008
  6. 6OXY USA Inc.Mar 2008 → Jan 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
325364-99DrillRegal Development Inc.Jan 12, 1987Jan 12, 1987—6,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-123836————

Formation tops

As filed on W-2/G-1. Subsea from 2,396 ft elevation.Download CSV →

FormationMD ftSubsea
WolfcampUPPER WOLFCAMP2,793-397
WolfcampMIDDLE WOLFCAMP3,646-1,250
WolfcampLOWER WOLFCAMP4,270-1,874
WolfcampBASE WOLFCAMP4,912-2,516
CanyonCANYON "A" SAND5,913-3,517
CanyonCANYON "C" SAND6,180-3,784
CanyonCANYON "D" SAND6,260-3,864
CanyonCANYON MARKER6,357-3,961

Perforations

Perforated and open-hole intervals.

FromToType
6,2496,260Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62566511225 S
4.56,3707.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 1987Apr 16, 1987Yes
00Jun 16, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331615, documented in the API reference.