WELL · 42-413-31813 · DISTRICT 7

Bell Cody #4

Y

Schleicher County · Pozo Rico (Wolfcamp) field · Producing  · Vertical

Bell Cody #4 (API 42-413-31813) is a well in Schleicher County operated by Txp Incorporated, completed July 30, 2008 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1992 and 1999, permitted to 6,700 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Txp Incorporated on the wellbore schedule.

Completion filings report 4 formation tops, including San Angelo, Coleman Junction, Wolfcamp, Canyon.

No lease production has been reported under this well’s leases.

Operator of record

TXP Incorporated

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

San Angelo, TX · P-5 Y, filed Mar 4, 2026 · 419 permits on file · (325) 212-6002

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXP Incorporated
Production reportsTXP, Incorporatedthrough Apr 2026
Latest permitTexaco E & P Inc.Nov 16, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
2
permits on file
Nov 16, 1999
last permit issued
Jul 30, 2008
completed
0
cumulative oil, bbl
1.99M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 30, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bell, Cody G-9-143622Cody Bell (Canyon)TXP, Incorporated10746KJan 1993 – Jul 2026
Bell, Cody G-9-176545Pozo Rico (Wolfcamp)TXP, Incorporated101.24MFeb 2000 – Jul 2026

Gas, mcf lease total

Last 12 months 12,146 · prior 12 12,857(-6%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Feb 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Feb 2005
  4. 4Diamond S Energy CompanyMar 2005 → Sep 2025
  5. 5TXP, IncorporatedOct 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
489577-99RecompletionTexaco E & P Inc.Nov 16, 1999Nov 16, 1999Feb 28, 20006,700
402518-99DrillTexaco E & P Inc.Aug 20, 1992Aug 21, 1992Nov 22, 19926,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-143622————
—— G-9-176545————

Formation tops

As filed on W-2/G-1. Subsea from 2,414 ft elevation.Download CSV →

FormationMD ftSubsea
San Angelo7901,624
Coleman Junction2,530-116
Wolfcamp4,786-2,372
Wolfcamp4,850-2,436
Canyon6,070-3,656
CanyonCANYON A6,070-3,656

Perforations

Perforated and open-hole intervals.

FromToType
4,7864,870Perforated
4,8504,870Perforated
6,0706,421Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62570011550 S
4.56,7007.8751,900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 23, 2009Aug 20, 2008—
00May 18, 2000Apr 5, 2000Yes
00May 2, 2000——
00Mar 15, 1993Jan 5, 1993Yes
00Jan 28, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41331813, documented in the API reference.