WELL · 42-413-31857 · DISTRICT 7
Treadwell #2
Schleicher County · Fort McKavitt (Canyon) field · Vertical
Treadwell #2 (API 42-413-31857) is a plugged well in Schleicher County, plugged August 19, 2011, last operated by Hannathon Petroleum LLC.
The RRC has issued one drilling permit, issued September 28, 1993, permitted to 4,700 ft.
It was permitted by Ozark Exploration, Inc. and has since transferred to Hannathon Petroleum LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Coleman Junction, Home Creek, Palo Pinto, Canyon.
Its lease has reported 1.12K barrels of oil and 1.22K mcf of gas since October 1993, last reporting in September 2012.
Operator of record
Permitted by Ozark Exploration, Inc.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Aug 4, 2025 · 232 permits on file · (432) 687-3700
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hannathon Petroleum LLC |
| Production reports | Freedom Energy, Inc. (I)through Oct 1995 |
| Latest permit | Ozark Exploration, Inc.Sep 28, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 1
- permits on file
- Sep 28, 1993
- last permit issued
- Oct 13, 1993
- completed
- 1.12K
- cumulative oil, bbl
- 1.22K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1993 THROUGH Sep 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 13, 1993
- Shut in
- —
- Plugged
- Aug 19, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Treadwell O-9-13538 | Fort McKavitt (Canyon) | Hannathon Petroleum, LLC | 1 | 1.12K | 1.22K | Oct 1993 – Sep 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Freedom Energy, Inc. (I)Oct 1993 → May 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416397-99 | Drill | Ozark Exploration, Inc. | Sep 24, 1993 | Sep 28, 1993 | Sep 27, 1993 | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13538 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,278 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 820 | 1,458 |
| Home Creek | 3,602 | -1,324 |
| Palo PintoPALO PINTO LIME | 3,816 | -1,538 |
| Canyon | 4,025 | -1,747 |
| Lower Camar Sd. | 4,108 | -1,830 |
| StrawnSTRAWN LIME | 4,200 | -1,922 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,026 | 4,070 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 541 | 11 | 245 S |
| 4.5 | 4,250 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 27, 1993 | Nov 8, 1993 | — |
| 00 | Nov 24, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-413-31857 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-413-31857 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41331857, documented in the API reference.