WELL · 42-415-02856 · DISTRICT 8

Sharon Ridge Canyon Unit #1606

Y

Scurry County · Diamond -M- (Canyon Lime Area) field · Injection  · Vertical

Sharon Ridge Canyon Unit #1606 (API 42-415-02856) is a well in Scurry County operated by Oxy USA Wtp LP, completed October 30, 2014 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 9, 2014, permitted to 7,100 ft.

Completion filings report 3 formation tops, including Yates, Clear Fork, Canyon.

Its lease has reported 17.4M barrels of oil and 44.6M mcf of gas since January 1993, last reporting in July 2026. The lease carries 400 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 1.05M barrels injected in the 12 months reported through July 2025.

Operator of record

OXY USA WTP LP

Houston, TX · P-5 Y, filed Sep 4, 2025 · 2,289 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsOXY USA WTP LPthrough Apr 2026
Latest permitOXY USA WTP LPOct 9, 2014
7,100
total depth, ft
1
permits on file
Oct 9, 2014
last permit issued
Oct 30, 2014
completed
17.4M
cumulative oil, bbl
44.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 30, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 400 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sharon Ridge Canyon Unit O-11-1037Diamond -M- (Canyon Lime Area)OXY USA WTP LP40017.4M44.6MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 198,125 · prior 12 213,214(-7%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jul 2005
  3. 3OXY USA WTP LPAug 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
797511-99RecompletionOXY USA WTP LPOct 1, 2014Oct 9, 2014Oct 8, 20147,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-1037————

Formation tops

As filed on W-2/G-1. Subsea from 2,351 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,3301,021
Clear ForkCLEARFORK3,350-999
Canyon6,700-4,349

Perforations

Perforated and open-hole intervals.

FromToType
6,6936,722Open hole
6,6936,792Open hole
6,7226,792Open hole
6,7366,782Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,867111,200 S
5.56,6936.75400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 12, 2016Apr 6, 2016—
00Nov 12, 2008Nov 5, 2007—
00Jun 2, 1998May 13, 1998—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.05M
bbl, last 12 reported months
13.7M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096483H-1 InjectionActive12,0003,1006,315–7,385

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,046,171 · prior 12 867,046(+21%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41502856, documented in the API reference.