WELL · 42-415-04169 · DISTRICT 8

Cogdell Canyon Reef Unit #6040

N

Scurry County · Cogdell (Area) field  · Vertical

Cogdell Canyon Reef Unit #6040 (API 42-415-04169) is a disposal or injection well in Scurry County operated by Occidental Permian Ltd. under an active UIC permit.

The RRC has issued one drilling permit, issued July 6, 2017, permitted to 7,200 ft.

Completion filings report 4 formation tops, including Yates, San Andres, Clear Fork, Canyon.

Its lease has reported 49.3M barrels of oil and 97.9M mcf of gas since January 1993, last reporting in July 2026. The lease carries 517 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 604K barrels injected in the 12 months reported through June 2025; TexNet located 2 M2+ earthquakes within 10 km over the last two years.

Operator of record

Occidental Permian Ltd.

Houston, TX · P-5 Y, filed Dec 4, 2025 · 6,251 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOccidental Permian Ltd.
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitOccidental Permian Ltd.Jul 6, 2017
7,200
total depth, ft
1
permits on file
Jul 6, 2017
last permit issued
—
completed
49.3M
cumulative oil, bbl
97.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

32.965939, -100.857742

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Scurry County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 517 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cogdell Canyon Reef Unit O-11-8325Cogdell (Area)Occidental Permian Ltd.51749.3M97.9MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 610,376 · prior 12 688,608(-11%)

050K100K202420252026

Gas, mcf lease total

Last 12 months 3,956,962 · prior 12 2,624,356(+51%)

01M2M3M202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Jan 1998
  3. 3Altura Energy Ltd.Feb 1998 → Apr 2000
  4. 4Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
828435-99RecompletionOccidental Permian Ltd.Jun 30, 2017Jul 6, 2017—7,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-8325————

Formation tops

As filed on W-2/G-1. Subsea from 2,290 ft elevation.Download CSV →

FormationMD ftSubsea
Yates4841,806
Yates7001,590
San Andres1,1001,190
San Andres1,506784
Clear ForkCLEARFORK2,391-101
Canyon6,100-3,810
Canyon6,396-4,106

Perforations

Perforated and open-hole intervals.

FromToType
6,6906,790Perforated
6,7706,800Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,510111,200 S
5.56,6747.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 9, 2024Sep 22, 2023—
00Jan 4, 2018Oct 12, 2017—
00Jan 4, 2005Apr 26, 2002—
00May 25, 1984——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

PL Fuller NCT-142-415-04171

0.9 KM · Occidental Permian Ltd. · Section with this well →

Yates7001,687
San Andres1,1001,287
Canyon6,600-4,213
Lime Reef6,737-4,350

Cogdell Canyon Reef Unit42-263-30284

1.1 KM · Occidental Permian Ltd. · Section with this well →

Canyon6,705-4,325

Cogdell Canyon Reef Unit42-263-00116

1.2 KM · Occidental Permian Ltd. · Section with this well →

Clear Fork2,240-8
Wolfcamp4,050-1,818
Canyon6,100-3,868
Cline6,250-4,018
Canyon6,383-4,151
Atoka6,970-4,738

P.L. Fuller NCT-142-415-35221

1.3 KM · Occidental Permian Ltd. · Section with this well →

Clear Fork522,337
Yates6051,784
Yates6051,784
San Andres9491,440
San Andres9491,440
Wichita-Albany1,997392
Wolfcamp3,345-956
Pennsylvanian4,388-1,999

15 TOPS · FIRST 8

Cogdell Canyon Reef Unit42-263-30283

1.5 KM · Occidental Permian Ltd. · Section with this well →

Clear Fork2,405-35
Wolfcamp4,180-1,810
Canyon6,653-4,283

Cogdell Canyon Reef Unit42-263-00114

1.6 KM · Occidental Permian Ltd. · Section with this well →

Canyon6,800-4,439
Cogdell (Area)6,800-4,439

PL Fuller NCT-142-263-00667

1.6 KM · Occidental Permian Ltd. · Section with this well →

Clear Fork2,532-113
Clfk2,532-113
Wich4,453-2,034
Wichita-Albany4,453-2,034
Strawn7,222-4,803
Strn7,222-4,803
Strawn7,264-4,845
Strawn7,283-4,864

10 TOPS · FIRST 8

Cogdell Canyon Reef Unit42-415-35711

1.7 KM · Occidental Permian Ltd. · Section with this well →

Yates6881,766
San Andres1,584870
Clear Fork2,572-118
Wichita-Albany4,474-2,020
Wolfcamp5,856-3,402
Wichita-Albany—
Spraberry—
Fuller Sand—

10 TOPS · FIRST 8

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

604K
bbl, last 12 reported months
8.6M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000022833H-1 InjectionActive10,0003,1506,300–7,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 603,921 · prior 12 389,650(+55%)

050K100K150K20242025

TexNet catalog via USGS

Seismicity near this well

2
M2+ events within 10 km, last 2 years
M3.1
largest

A proximity count, not an attribution. How to read it →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41504169, documented in the API reference.