TEXAS · WELLS · SCURRY COUNTY · API 42-415-30662 · DISTRICT 7B

West J. D. #2

Plugged

Scurry County · Fuller SE. (Canyon Reef) field  · Vertical

West J. D. #2 (API 42-415-30662) is a plugged well in Scurry County, plugged February 23, 1987, last operated by Texaco Inc..

The RRC has issued one drilling permit, issued September 10, 1986, permitted to 7,510 ft.

Operator of record

Texaco Inc.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 27, 1996
Permits on file
4,906
Phone
(432) 688-4643

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTexaco Inc.Sep 10, 1986
7,510
total depth, ft
1
permits on file
Sep 10, 1986
last permit issued
Dec 14, 1975
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 14, 1975
Shut in
—
Plugged
Feb 23, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
320343-99RecompletionTexaco Inc.Sep 10, 1986Sep 10, 1986—7,510

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 14, 1975West J. D. O-11-61570Fuller SE. (Canyon Reef)Texaco Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
—7,066Perforated

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41530662, documented in the API reference.