WELL · 42-415-32588 · DISTRICT 8

Sharon Ridge Canyon Unit #5607

N

Scurry County · Wildcat field  · Vertical

Sharon Ridge Canyon Unit #5607 (API 42-415-32588) is a well in Scurry County operated by Exxon Corp., completed July 27, 1990.

The RRC has issued one drilling permit, issued April 25, 1984, permitted to 6,700 ft.

It was permitted by Smith, R. E. and has since transferred to Exxon Corp. on the wellbore schedule.

Completion filings report 6 formation tops, including San Andres, San Angelo, Clear Fork, Spraberry.

Its 2 leases have reported 17.4M barrels of oil and 44.6M mcf of gas since January 1993, last reporting in July 2026. The leases carry 422 wells, so these are lease totals, not this well alone.

Operator of record

Exxon Corp.

Permitted by Smith, R. E.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsOXY USA WTP LPthrough Apr 2026
Latest permitSmith, R. E.Apr 25, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
1
permits on file
Apr 25, 1984
last permit issued
Jul 27, 1990
completed
17.4M
cumulative oil, bbl
44.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 27, 1990
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 422 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sharon Ridge Canyon Unit O-11-1037Diamond -M- (Canyon Lime Area)OXY USA WTP LP40017.4M44.6MJan 1993 – Jul 2026
Sharon Ridge Canyon Unit O-11-66437WildcatExxon Corp.2200Jan 1993 – May 1993

Oil, barrels lease total

Last 12 months 198,125 · prior 12 213,214(-7%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jul 2005
  3. 3OXY USA WTP LPAug 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
237346-99DrillSmith, R. E.Mar 22, 1984Apr 25, 1984Apr 28, 19846,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-1037————
—— O-11-66437————

Formation tops

As filed on W-2/G-1. Subsea from 2,320 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres1,988332
San Angelo2,845-525
Clear ForkCLEARFORK3,008-688
SpraberrySPRAYBERRY4,013-1,693
Wolfcamp5,270-2,950
CanyonCANYON REEF6,429-4,109

Perforations

Perforated and open-hole intervals.

FromToType
6,4286,604Perforated
6,4966,516Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,01512.41,100 S
8.6252,015111,225 S
5.56,9007.875990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 29, 2007May 11, 2007—
00Aug 5, 1997Jul 9, 1996—
00Jun 24, 1993May 7, 1993—
00Apr 20, 1992Aug 12, 1991—
00Jan 9, 1991Sep 18, 1990—
00Dec 7, 1990——
00May 16, 1990Apr 23, 1990—
00Jun 9, 1984May 24, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41532588, documented in the API reference.