WELL · 42-415-32617 · DISTRICT 8

Sharon Ridge Canyon Unit #5512

Y

Scurry County · Diamond -M- (Canyon Lime Area) field · Shut IN  · Vertical

Sharon Ridge Canyon Unit #5512 (API 42-415-32617) is a well in Scurry County operated by Oxy USA Wtp LP, completed April 24, 2019 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued June 20, 1984, permitted to 6,900 ft.

It was permitted by Smith, R. E. and has since transferred to Oxy USA Wtp LP on the wellbore schedule.

Completion filings report 6 formation tops, including San Andres, Clear Fork, Tubb, Spraberry.

Its lease has reported 17.4M barrels of oil and 44.6M mcf of gas since January 1993, last reporting in July 2026. The lease carries 400 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA WTP LP

Permitted by Smith, R. E.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Sep 4, 2025 · 2,289 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsOXY USA WTP LPthrough Apr 2026
Latest permitSmith, R. E.Jun 20, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,900
total depth, ft
1
permits on file
Jun 20, 1984
last permit issued
Apr 24, 2019
completed
17.4M
cumulative oil, bbl
44.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 24, 2019
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 400 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sharon Ridge Canyon Unit O-11-1037Diamond -M- (Canyon Lime Area)OXY USA WTP LP40017.4M44.6MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 198,125 · prior 12 213,214(-7%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jul 2005
  3. 3OXY USA WTP LPAug 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
243468-99DrillSmith, R. E.May 15, 1984Jun 20, 1984Aug 15, 19846,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-1037————

Formation tops

As filed on W-2/G-1. Subsea from 2,306 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres1,941365
Clear ForkCLEARFORK2,823-517
Tubb3,399-1,093
SpraberrySPRAYBERRY3,851-1,545
Wolfcamp5,205-2,899
CanyonCANYON REEF6,503-4,197

Perforations

Perforated and open-hole intervals.

FromToType
6,5046,511Perforated
6,5046,863Perforated
6,5126,553Perforated
6,5306,540Perforated
6,5706,585Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,015111,225 S
5.56,9007.875220 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 15, 2020Oct 29, 2019—
00Nov 22, 1995Sep 29, 1995—
00Aug 20, 1990Aug 9, 1990—
00Oct 3, 1984Sep 24, 1984—
00Oct 2, 1984Sep 24, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41532617, documented in the API reference.