WELL · 42-415-33611 · DISTRICT 8

Ochsner 64 #1

N

Scurry County · Mirage (Strawn) field  · Vertical

Ochsner 64 #1 (API 42-415-33611) is a well in Scurry County operated by Cazador Operating LLC, completed October 18, 1997.

The RRC has issued one drilling permit, issued August 18, 1997, permitted to 7,900 ft.

It was permitted by Baytech, Inc. and has since transferred to Cazador Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Vale, Wolfcamp, Canyon, Strawn.

Its 2 leases have reported 110K barrels of oil and 231K mcf of gas since October 1997, last reporting in July 2026. The leases carry 20 wells, so these are lease totals, not this well alone.

Operator of record

Cazador Operating LLC

Permitted by Baytech, Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Aug 4, 2025 · 2 permits on file · (214) 789-2665

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCazador Operating LLC
Production reportsManzanita Operating, LLCthrough Apr 2026
Latest permitBaytech, Inc.Aug 18, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,900
total depth, ft
1
permits on file
Aug 18, 1997
last permit issued
Oct 18, 1997
completed
110K
cumulative oil, bbl
231K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 18, 1997
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mirage Waterflood Unit O-11-70663Mirage (Strawn)Manzanita Operating, LLC1738.4K52KMar 2018 – Jul 2026
Ochsner "64" O-11-67820Mirage (Strawn)Cazador Operating, LLC371.6K179KOct 1997 – Jul 2018

Oil, barrels lease total

Last 12 months 4,053 · prior 12 4,021(+1%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 350 · prior 12 544(-36%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Baytech, Inc.Oct 1997 → Dec 2002
  2. 2Patriot Resources, Inc.Jan 2003 → Aug 2015
  3. 3Cazador Operating, LLCMar 2018 → Dec 2018
  4. 4Manzanita Operating, LLCJan 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
466338-99DrillBaytech, Inc.Aug 15, 1997Aug 18, 1997Sep 12, 19977,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67820————
—— O-11-70663————

Formation tops

As filed on W-2/G-1. Subsea from 2,253 ft elevation.Download CSV →

FormationMD ftSubsea
Vale2,974-721
Wolfcamp4,456-2,203
WolfcampWOLFCAMP SHALE4,570-2,317
CanyonCANYON SAND7,068-4,815
StrawnSTRAWN SAND7,361-5,108
StrawnSTRAWN REEF7,413-5,160

Perforations

Perforated and open-hole intervals.

FromToType
7,3637,374Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,750111,050 S
7.8757,5657.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 19, 2018Nov 12, 1997Yes
00Dec 17, 1997Nov 12, 1997Yes
00Dec 10, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41533611, documented in the API reference.