WELL · 42-417-01080 · DISTRICT 7
Windham J.D. 81-N #1
Shackelford County · Windham West (Palo Pinto SD) field · Vertical
Windham J.D. 81-N #1 (API 42-417-01080) is a well in Shackelford County operated by Dahab Energy Inc., completed August 22, 1987.
The RRC has issued one drilling permit, issued January 20, 1988, permitted to 4,100 ft.
It was permitted by Kadane Oil Company and has since transferred to Dahab Energy Inc. on the wellbore schedule.
Completion filings report 10 formation tops, including Palo Pinto, Canyon, Morris Sand, Gardner Sand.
Its 2 leases have reported 62 barrels of oil and 162 mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Kadane Oil Company; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Nov 4, 2025 · 35 permits on file · (214) 707-6532
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dahab Energy Inc. |
| Production reports | Dahab Energy Inc.through Mar 2026 |
| Latest permit | Kadane Oil CompanyJan 20, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,100
- total depth, ft
- 1
- permits on file
- Jan 20, 1988
- last permit issued
- Aug 22, 1987
- completed
- 62
- cumulative oil, bbl
- 162
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 22, 1987
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Windham,j.d. 81-N O-8-32835 | Windham, West (Palo Pinto SD) | Dahab Energy Inc. | 1 | 62 | 162 | Sep 2025 – Jul 2026 |
| Windham,j.d. 81-N G-8-126159 | Windham, West (Palo Pinto SD) | Dahab Energy Inc. | 1 | 0 | 0 | Jan 1993 – Sep 2025 |
Oil, barrels lease total
Last 12 months 62 · prior 12 0
Gas, mcf lease total
Last 12 months 162 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dahab Energy Inc.Sep 2025 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 341547-99 | Recompletion | Kadane Oil Company | Jan 18, 1988 | Jan 20, 1988 | — | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-126159 | — | — | — | — |
| — | — O-8-32835 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,955 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO SAND | 3,150 | -1,195 |
| CanyonCANYON LIME | 3,212 | -1,257 |
| Morris Sand | 3,414 | -1,459 |
| Gardner Sand | 3,912 | -1,957 |
| Cook Sand - Disposal | — | — |
| Frye - Disposal | — | — |
| Saddle CreekSADDLE CREEK - DISPOSAL | — | — |
| Shallow Sandstones - Overpressur | — | — |
| Unidentified-County Regular - DI | — | — |
| WolfcampWOLFCAMP - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,154 | 3,192 | Perforated |
| — | 3,926 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 61 | 12.25 | 60 S |
| 5.5 | 3,940 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 24, 2025 | Nov 7, 2025 | — |
| 00 | May 12, 1988 | Jan 14, 1988 | Yes |
| 00 | Feb 2, 1988 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-01080 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-01080 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41701080, documented in the API reference.