WELL · 42-417-20098 · DISTRICT 7
Williams W. M. #3W
Shackelford County · Moran N. (Moran) field · Vertical
Williams W. M. #3W (API 42-417-20098) is a plugged well in Shackelford County, plugged October 20, 1998, last operated by Double J Pipe.
The RRC has issued one drilling permit, issued October 8, 1985, permitted to 1,350 ft.
It was permitted by Bendorf, Otto and has since transferred to Double J Pipe on the wellbore schedule.
Completion filings report 2 formation tops, including Canyon, Winchell.
Its lease has reported 816 barrels of oil and 21 mcf of gas since January 1993, last reporting in June 2006. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Bendorf, Otto; the EWA schedule now lists a different operator.
Breckenridge, TX · P-5 Y, filed Nov 6, 1998
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Double J Pipe |
| Production reports | Double J Pipethrough May 1996 |
| Latest permit | Bendorf, OttoOct 8, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,350
- total depth, ft
- 1
- permits on file
- Oct 8, 1985
- last permit issued
- Jan 1, 1986
- completed
- 816
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 1, 1986
- Shut in
- —
- Plugged
- Oct 20, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Williams, W. M. O-8-10504 | Moran, N. (Moran) | Double J Pipe | 2 | 816 | 21 | Jan 1993 – Jun 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bendorf Services & Supply CoJan 1993 → Dec 1994
- 2Double J PipeJan 1995 → May 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 286887-99 | Other | Bendorf, Otto | Oct 7, 1985 | Oct 8, 1985 | — | 1,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-10504 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 980 | 1,290 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 121 | 11 | 100 S |
| 5.5 | 1,345 | 7.875 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 1986 | Apr 30, 1986 | Yes |
| 00 | May 7, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-20098 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-20098 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 14.6K
- bbl, last 12 reported months
- 73K
- bbl, all reported
- Apr 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000058761 | W-14 Disposal | Plugged Oct 27, 1998 | 300 | 440 | 980–1,290 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 14,600 · prior 12 14,600(+0%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41720098, documented in the API reference.