WELL · 42-417-32482 · DISTRICT 7

Wise Unit #1

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Wise Unit #1 (API 42-417-32482) is a plugged well in Shackelford County, plugged August 15, 1988, last operated by Davis Brothers.

The RRC has issued 2 drilling permits between 1978 and 1984, permitted to 4,250 ft.

Completion filings report 10 formation tops, including T/Home Creek, T/Patio, T/Palo Pinto, T/Moran Sand.

Operator of record

Davis Brothers

Based in
Abilene, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 19, 1992
Permits on file
311
Phone
(325) 677-8194

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDavis Brothers
Production reportsnone
Latest permitDavis BrothersSep 4, 1984
4,250
total depth, ft
2
permits on file
Sep 4, 1984
last permit issued
Mar 13, 1978
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 13, 1978
Shut in
—
Plugged
Aug 15, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
250348-99RecompletionDavis BrothersSep 10, 1984Sep 4, 1984—3,960
15592-99DrillDavis BrothersJan 4, 1978Jan 4, 1978Feb 26, 19784,250

Formation tops

As filed on W-2/G-1. Subsea from 1,421 ft elevation.Download CSV →

FormationMD ftSubsea
T/Home Creek1,277144
T/Patio1,857-436
T/Palo Pinto1,908-487
T/Moran Sand2,153-732
T/Morris Lime2,216-795
T/Caddo3,449-2,028
T/Lake Sand3,800-2,379
T/Duffer3,984-2,563
T/Barrnett4,052-2,631
T/Ellenberger4,167-2,746

Perforations

Perforated and open-hole intervals.

FromToType
3,8983,902Perforated
3,9964,000Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251101180 S
5.54,1727.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 16, 1984Sep 10, 1984—
00Oct 5, 1984——
00Jan 12, 1984May 16, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732482, documented in the API reference.