TEXAS · WELLS · SHACKELFORD COUNTY · API 42-417-32706 · DISTRICT 6E

Nail Ranch MP B #1

Plugged

Shackelford County · Tapatio (Strawn) field  · Vertical

Nail Ranch MP B #1 (API 42-417-32706) is a plugged well in Shackelford County, plugged October 14, 1988, last operated by Jacobs C. E. CO..

The RRC has issued 2 drilling permits between 1978 and 1984, permitted to 5,340 ft.

Completion filings report 3 formation tops, including Saddle Creek, Breckenridge Ls, Strawn.

Operator of record

Jacobs C. E. Co.

Based in
Albany, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 20, 2021
Permits on file
356
Phone
(325) 762-3301

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJacobs C. E. Co.
Production reportsnone
Latest permitJacobs, C. E., Co.Jun 20, 1984
5,340
total depth, ft
2
permits on file
Jun 20, 1984
last permit issued
Jul 24, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 24, 1984
Shut in
—
Plugged
Oct 14, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
242662-99OtherJacobs, C. E., Co.Jun 18, 1984Jun 20, 1984—4,500
34319-99DrillMusselman Petroleum & Land Co.Oct 10, 1978Oct 10, 1978Oct 12, 19785,340

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 24, 1984Nail Ranch MP B G-8-113750Tapatio (Strawn)Jacobs C. E. Co.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,752 ft elevation.Download CSV →

FormationMD ftSubsea
Saddle CreekSADDLE CREEK LS1,496256
Breckenridge LS1,760-8
StrawnSTRAWN SS4,048-2,296

Perforations

Perforated and open-hole intervals.

FromToType
4,0524,055Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510112100 S
4.54,2077.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 17, 1984Sep 28, 1984—
00Dec 13, 1984Aug 31, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732706, documented in the API reference.