TEXAS · WELLS · SHACKELFORD COUNTY · API 42-417-32810 · DISTRICT 6E

Dawson-Conway 196 #2

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Dawson-Conway 196 #2 (API 42-417-32810) is a plugged well in Shackelford County, plugged March 13, 1979, last operated by Whitt W. J..

The RRC has issued one drilling permit, issued January 23, 1979, permitted to 1,500 ft.

Operator of record

Whitt W. J.

Based in
Albany, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 29, 1996
Permits on file
372
Phone
(325) 762-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWhitt W. J.
Production reportsnone
Latest permitWhitt, W. J.Jan 23, 1979
1,500
total depth, ft
1
permits on file
Jan 23, 1979
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 13, 1979

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
41292-99DrillWhitt, W. J.Jan 23, 1979Jan 23, 1979—1,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—Dawson-Conway 196 O-8-14927Shackelford County RegularWhitt W. J.Plugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41732810, documented in the API reference.