TEXAS · WELLS · SHACKELFORD COUNTY · ACKERS RANCH 26 TANNEHILL SD. U. LEASE · API 42-417-33156 · DISTRICT 6E

Ackers Ranch 26 Tannehill Sd. U. #6

Plugged

Shackelford County · WE Hope (Tannehill) field  · Vertical

Ackers Ranch 26 Tannehill SD. U. #6 (API 42-417-33156) is a plugged well in Shackelford County, plugged October 12, 2023, last operated by Overland Operating Company LLC.

The RRC has issued one drilling permit, issued January 4, 1980, permitted to 1,900 ft.

It was permitted by Musselman Petroleum & Land CO. and has since transferred to Overland Operating Company LLC on the wellbore schedule.

Its lease has reported 46.3K barrels of oil and 20 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 16 wells, so these are lease totals, not this well alone.

Operator of record

Overland Operating Company LLC

Permitted by Musselman Petroleum & Land Co.; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Delinquent (D)
P-5 last filed
Jan 4, 2021
Permits on file
17
Phone
(325) 232-7753

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOverland Operating Company LLC
Production reportsOverland Operating Company, LLCthrough Jan 2021
Latest permitMusselman Petroleum & Land Co.Jan 4, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,900
total depth, ft
1
permits on file
Jan 4, 1980
last permit issued
Feb 26, 1980
completed
46.3K
cumulative oil, bbl
20
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 26, 1980
Shut in
—
Plugged
Oct 12, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ackers Ranch 26 Tannehill Sd. U. O-8-19451WE Hope (Tannehill)Overland Operating Company, LLC1646.3K20Jan 1993 – Jan 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wester, J. S.Jan 1993 → Jul 1995
  2. 2Robertson Resources, Inc.Aug 1995 → May 2002
  3. 3Tollett OilJun 2002 → Dec 2012
  4. 4M & K Operating LLCJan 2013 → Nov 2017
  5. 5Overland Operating Company, LLCDec 2017 → Jan 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
68683-99DrillMusselman Petroleum & Land Co.Jan 4, 1980Jan 4, 1980—1,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 26, 1980Ackers Ranch 26 Tannehill Sd. U. O-8-19451WE Hope (Tannehill)Overland Operating Company LLCPlugged—
Feb 26, 1980Ackers L.J. B (Sec. 26) O-8-15362WE Hope (Tannehill)Musselman Petroleum & Land Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
1,4941,502Perforated
—1,502Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251021275 S
2.3751,533——
4.51,5977.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Mar 26, 1980—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41733156, documented in the API reference.