TEXAS · WELLS · SHACKELFORD COUNTY · NAIL, J.H. 119 LEASE · API 42-417-33245 · DISTRICT 6E

Nail J.H. 119 #34

Shut in

Shackelford County · Cook Ranch field · Shut In  · Vertical

Nail J.H. 119 #34 (API 42-417-33245) is a well in Shackelford County operated by Tom-Tom Operating LLC, completed June 7, 1980 and listed as shut in on the RRC schedule, shut in February 1, 2025.

The RRC has issued one drilling permit, issued March 4, 1980, permitted to 1,750 ft.

It was permitted by Musselman Petroleum & Land CO. and has since transferred to Tom-Tom Operating LLC on the wellbore schedule.

Its lease has reported 87.8K barrels of oil and 66 mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 44 wells, so these are lease totals, not this well alone.

Operator of record

Tom-Tom Operating LLC

Permitted by Musselman Petroleum & Land Co.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 13, 2025
Permits on file
8
Phone
(214) 673-8848

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTom-Tom Operating LLC
Production reportsTom-Tom Operating, LLCthrough Apr 2026
Latest permitMusselman Petroleum & Land Co.Mar 4, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,750
total depth, ft
1
permits on file
Mar 4, 1980
last permit issued
Jun 7, 1980
completed
87.8K
cumulative oil, bbl
66
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 7, 1980
Shut in
Feb 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 44 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail, J.H. 119 O-8-13042Cook RanchTom-Tom Operating, LLC4487.8K66Jan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 195 · prior 12 17

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Furry Producing CompanyJan 1993 → Jun 1993
  2. 2Holson Well ServiceJul 1993 → Sep 1999
  3. 3Dahab Energy Inc.Oct 1999 → Dec 2001
  4. 4Synergy Operating Co., LLCJan 2002 → Apr 2023
  5. 5Tollett OilMay 2023 → Nov 2024
  6. 6Tom-Tom Operating, LLCSep 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
74102-99DrillMusselman Petroleum & Land Co.Mar 4, 1980Mar 4, 1980—1,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 7, 1980Nail J.H. 119 O-8-13042Cook RanchTom-Tom Operating LLCShut In · shut in Feb 1, 20251,750

Perforations

Perforated and open-hole intervals.

FromToType
1,3561,366Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251021190 S
2.3751,279——
4.51,4386.75100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 31, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41733245, documented in the API reference.