WELL · 42-417-34512 · DISTRICT 7
Diller 42A #1
Shackelford County · Diller (Moran Upper) field · Vertical
Diller 42a #1 (API 42-417-34512) is a plugged well in Shackelford County, plugged February 7, 1995, last operated by Jones Company Ltd..
The RRC has issued 2 drilling permits between 1982 and 1992, permitted to 4,500 ft.
Completion filings report 12 formation tops, including Moran, T/Moran, T/Moran Sand, Gardner.
Operator of record
- Based in
- Albany, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 22, 1996
- Permits on file
- 207
- Phone
- (325) 762-3353
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jones Company Ltd. |
| Production reports | Jones Company, Ltd.through Oct 1994 |
| Latest permit | Jones Company, Ltd.Apr 15, 1992 |
- 4,500
- total depth, ft
- 2
- permits on file
- Apr 15, 1992
- last permit issued
- Mar 30, 1992
- completed
- 0
- cumulative oil, bbl
- 17.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 30, 1992
- Shut in
- —
- Plugged
- Feb 7, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Diller "42A" G-8-141249 | Diller (Moran, Upper) | Jones Company, Ltd. | 1 | 0 | 17.6K | Jan 1993 – Feb 1995 |
| Diller "42A" O-8-26056 | Diller (Gardner) | Jones Company, Ltd. | 1 | 0 | 0 | Jan 1993 – Feb 1995 |
| — G-8-121035 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jones Company, Ltd.Jan 1993 → Oct 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 398286-99 | Recompletion | Jones Company, Ltd. | Apr 10, 1992 | Apr 15, 1992 | Mar 27, 1992 | 4,254 |
| 156212-99 | Drill | Jones Co. | Apr 8, 1982 | Apr 8, 1982 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-121035 | — | — | — | — |
| — | — G-8-141249 | — | — | — | — |
| — | — O-8-26056 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,498 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,358 | 2,362 | Perforated |
| 2,840 | 2,844 | Perforated |
| 2,842 | 2,846 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 101 | 12.25 | 90 S |
| 8.375 | 101 | 12.25 | 90 S |
| 2.375 | 2,560 | — | — |
| 4.5 | 4,253 | 7.875 | 465 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 1, 1992 | Apr 10, 1992 | Yes |
| 00 | May 12, 1992 | — | — |
| 00 | Feb 15, 1991 | Jan 24, 1991 | — |
| 00 | Jan 29, 1991 | — | — |
| 00 | Jun 2, 1986 | May 13, 1986 | — |
| 00 | May 17, 1986 | — | — |
| 00 | Apr 5, 1984 | Jan 30, 1984 | — |
| 00 | Apr 4, 1984 | Jan 30, 1984 | — |
| 00 | Jan 12, 1984 | Jul 5, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-34512 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-34512 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41734512, documented in the API reference.