WELL · 42-417-35774 · DISTRICT 7

Blackburn #12

Plugged

Shackelford County · Pannell S. (Strawn) field  · Vertical

Blackburn #12 (API 42-417-35774) is a plugged well in Shackelford County, plugged April 17, 2017, last operated by Van Operating Ltd..

The RRC has issued 2 drilling permits between 1984 and 1992, permitted to 4,600 ft.

It was permitted by Jones Company, Ltd. and has since transferred to Van Operating Ltd. on the wellbore schedule.

Completion filings report 6 formation tops, including T/Gardner, T/Caddo, B/Caddo, T/Now Conglo..

Its 2 leases have reported 85.9K barrels of oil and 74.9K mcf of gas since January 1993, last reporting in May 2022. The leases carry 21 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Permitted by Jones Company, Ltd.; the EWA schedule now lists a different operator.

Based in
Albany, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 28, 2021
Permits on file
96
Phone
(325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Apr 2016
Latest permitJones Company, Ltd.Jan 24, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
2
permits on file
Jan 24, 1992
last permit issued
Nov 27, 1991
completed
85.9K
cumulative oil, bbl
74.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 27, 1991
Shut in
—
Plugged
Apr 17, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 21 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blackburn O-8-19783Pannell, S. (Strawn)Van Operating, Ltd.1385.9K74.9KJan 1993 – May 2022
Blackburn O-8-17429Marsha (Ellen)Van Operating, Ltd.800Jan 1993 – Apr 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Apr 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
395954-99RecompletionJones Company, Ltd.Jan 17, 1992Jan 24, 1992Nov 19, 19914,397
241758-99DrillJones Co.Apr 27, 1984May 29, 1984—4,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-17429————
—— O-8-19783————

Formation tops

As filed on W-2/G-1. Subsea from 1,554 ft elevation.Download CSV →

FormationMD ftSubsea
T/Gardner3,120-1,566
T/Caddo3,800-2,246
B/Caddo4,108-2,554
T/Now Conglo.4,228-2,674
T/Miss4,324-2,770
T/Ellen4,382-2,828

Perforations

Perforated and open-hole intervals.

FromToType
3,1233,128Perforated
—4,390Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510312.2590 sx
4.54,3907.875350 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 16, 1992Jan 16, 1992Yes
00Jan 28, 1992——
00Aug 28, 1984Aug 6, 1984—
00Aug 22, 1984Aug 6, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093105H-1 InjectionPlugged May 9, 20175001,5003,123–3,128

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41735774, documented in the API reference.