TEXAS · WELLS · SHACKELFORD COUNTY · NAIL B-8 LEASE · API 42-417-35900 · DISTRICT 6E

Nail B-8 #5

Shut in

Shackelford County · Cronk (Tannehill) field · NO Production  · Vertical

Nail B-8 #5 (API 42-417-35900) is a well in Shackelford County operated by M & K Operating LLC, completed August 15, 1984 and listed as no production on the RRC schedule, shut in June 1, 2024.

The RRC has issued one drilling permit, issued July 17, 1984, permitted to 900 ft.

It was permitted by Rampart Petroleum, Incorporated and has since transferred to M & K Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its lease has reported 687 barrels of oil and 36 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

M & K Operating LLC

Permitted by Rampart Petroleum, Incorporated; the EWA schedule now lists a different operator.

Based in
Albany, TX
P-5 status
Delinquent (D)
P-5 last filed
Feb 28, 2024
Permits on file
11
Phone
(325) 762-2425

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleM & K Operating LLC
Production reportsM & K Operating LLCthrough May 2024
Latest permitRampart Petroleum, IncorporatedJul 17, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

900
total depth, ft
1
permits on file
Jul 17, 1984
last permit issued
Aug 15, 1984
completed
687
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 15, 1984
Shut in
Jun 1, 2024
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail B-8 O-8-21606Cronk (Tannehill)M & K Operating LLC568736Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 1(-100%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Frontier Operating CorporationJan 1993 → May 2001
  2. 2B P Operating CompanyJun 2001 → Dec 2002
  3. 3Boo-Row Pipe & Supply, Inc.Apr 2003 → Jan 2006
  4. 4Clavo Oil, LLCDec 2006 → May 2017
  5. 5FTC Consulting, LLCNov 2017 → Jun 2018
  6. 6M & K Operating LLCSep 2021 → May 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
245291-99DrillRampart Petroleum, IncorporatedJul 17, 1984Jul 17, 1984—900

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 15, 1984Nail B-8 O-8-21606Cronk (Tannehill)M & K Operating LLCNO Production · shut in Jun 1, 2024900

Formation tops

As filed on W-2/G-1. Subsea from 1,516 ft elevation.Download CSV →

FormationMD ftSubsea
TannehillTANNEHILL SD856660

Perforations

Perforated and open-hole intervals.

FromToType
858861Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.58987.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 25, 1984Aug 30, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41735900, documented in the API reference.