TEXAS · WELLS · SHACKELFORD COUNTY · G-8-130853 LEASE · API 42-417-36187 · DISTRICT 6E
Nail ZA #1
Shackelford County · Shackelford County Regular (Gas) field · Vertical
Nail ZA #1 (API 42-417-36187) is a plugged well in Shackelford County, plugged October 17, 1990, last operated by Jacobs C. E. CO..
The RRC has issued 2 drilling permits between 1985 and 1989, permitted to 4,999 ft.
Completion filings report 9 formation tops, including B/Coleman Junction, B/Coleman Junction Ls, Frye Ss, Saddle Creek.
Operator of record
- Based in
- Albany, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 20, 2021
- Permits on file
- 356
- Phone
- (325) 762-3301
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jacobs C. E. Co. |
| Production reports | none |
| Latest permit | Jacobs, C. E., Co.Jun 2, 1989 |
- 4,999
- total depth, ft
- 2
- permits on file
- Jun 2, 1989
- last permit issued
- Jan 31, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 31, 1989
- Shut in
- —
- Plugged
- Oct 17, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-8-130853 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 359824-99 | Recompletion | Jacobs, C. E., Co. | May 30, 1989 | Jun 2, 1989 | — | 4,999 |
| 266838-99 | Drill | Jacobs, C. E., Co. | Feb 12, 1985 | Feb 13, 1985 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 31, 1989 | Nail ZA G-8-130853 | Shackelford County Regular (Gas) | Jacobs C. E. Co. | Plugged | — |
| Mar 26, 1985 | Nail ZA O-8-22458 | Foyle Creek (Mississippian) | Jacobs C. E. Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,553 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman Junction | 560 | 993 |
| B/Coleman Junction LS | 560 | 993 |
| Frye SS | 970 | 583 |
| Saddle Creek | 1,124 | 429 |
| Saddle CreekSADDLE CREEK LS | 1,124 | 429 |
| Breckenridge | 1,387 | 166 |
| Breckenridge LS | 1,387 | 166 |
| Strawn | 3,030 | -1,477 |
| Caddo | 4,466 | -2,913 |
| Mississippian | 4,734 | -3,181 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 972 | 978 | Perforated |
| 4,896 | 4,900 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 121 | 12.25 | 80 S |
| 4.5 | 1,875 | 7.875 | 400 S |
| 4.5 | 4,999 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 24, 1989 | May 26, 1989 | Yes |
| 00 | Jun 9, 1989 | — | — |
| 00 | May 20, 1985 | Apr 19, 1985 | — |
| 00 | May 17, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-36187 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-36187 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41736187, documented in the API reference.