TEXAS · WELLS · SHACKELFORD COUNTY · NAIL "M" LEASE · API 42-417-36437 · DISTRICT 6E

Nail M #14

Plugged

Shackelford County · Nail (Cook Upper) field  · Vertical

Fields on the latest permit · any of 2
Nail (Cook, Upper) · Shackelford County Regular
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Nail M #14 (API 42-417-36437) is a plugged well in Shackelford County, plugged July 19, 2021, last operated by Van Operating Ltd..

The RRC has issued one drilling permit, issued July 25, 1985, permitted to 1,600 ft.

It was permitted by Jones CO. and has since transferred to Van Operating Ltd. on the wellbore schedule.

Completion filings report 3 formation tops, including B/Coal, Flippen, Waldrip.

Its lease has reported 326K barrels of oil and 697 mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 23 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Permitted by Jones Co.; the EWA schedule now lists a different operator.

Based in
Albany, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 28, 2021
Permits on file
96
Phone
(325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Oct 2020
Latest permitJones Co.Jul 25, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,600
total depth, ft
1
permits on file
Jul 25, 1985
last permit issued
Aug 1, 1985
completed
326K
cumulative oil, bbl
697
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 1, 1985
Shut in
—
Plugged
Jul 19, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail "M" O-8-22523Nail (Cook, Upper)Van Operating, Ltd.23326K697Jan 1993 – Oct 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Oct 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
281096-99DrillJones Co.Jul 24, 1985Jul 25, 1985—1,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 1, 1985Nail M O-8-22523Nail (Cook Upper)Van Operating Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,411 ft elevation.Download CSV →

FormationMD ftSubsea
B/Coal1,292119
Flippen1,297114
Waldrip1,34269

Perforations

Perforated and open-hole intervals.

FromToType
1,3061,315Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513012.2590 S
4.51,4027.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 17, 1985Aug 19, 1985—
00Aug 31, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41736437, documented in the API reference.