TEXAS · WELLS · SHACKELFORD COUNTY · API 42-417-36483 · DISTRICT 6E
Cook W. I. #5585A
Shackelford County · Cook Ranch field · Vertical
Cook W. I. #5585A (API 42-417-36483) is a plugged well in Shackelford County, plugged June 9, 1989, last operated by Stasney Well Service LLC.
The RRC has issued one drilling permit, issued August 26, 1985, permitted to 1,500 ft.
It was permitted by Young, Marshall R., Oil Company and has since transferred to Stasney Well Service LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Coleman Junction, Sedwick Lime, Dothan Lime, Stockweather Lime.
Operator of record
Permitted by Young, Marshall R., Oil Company; the EWA schedule now lists a different operator.
- Based in
- Albany, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 22, 2026
- Permits on file
- 305
- Phone
- (325) 762-3311
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stasney Well Service LLC |
| Production reports | none |
| Latest permit | Young, Marshall R., Oil CompanyAug 26, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,500
- total depth, ft
- 1
- permits on file
- Aug 26, 1985
- last permit issued
- Oct 8, 1985
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 8, 1985
- Shut in
- —
- Plugged
- Jun 9, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Wells named Cook W. I.
Stasney Well Service LLC's other wells filed under this lease name in Shackelford County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsPermits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 283275-99 | Drill | Young, Marshall R., Oil Company | Aug 9, 1985 | Aug 26, 1985 | — | 1,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 8, 1985 | Cook W. I. O-8-3564 | Cook Ranch | Stasney Well Service LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,687 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 620 | 1,067 |
| Sedwick Lime | 770 | 917 |
| Dothan Lime | 922 | 765 |
| Stockweather Lime | 1,144 | 543 |
| Saddle CreekSADDLE CREEK LIME | 1,200 | 487 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,414 | 1,420 | Perforated |
| 1,423 | 1,425 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 12 | 75 S |
| 4.5 | 1,469 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 7, 1985 | Oct 25, 1985 | Yes |
| 00 | Nov 6, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-36483 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-36483 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41736483, documented in the API reference.