WELL · 42-417-36559 · DISTRICT 7

Nail M #10

Plugged

Shackelford County · Nail (Cook Upper) field  · Vertical

Nail M #10 (API 42-417-36559) is a plugged well in Shackelford County, plugged July 30, 2019, last operated by Van Operating Ltd..

The RRC has issued one drilling permit, issued September 13, 1985, permitted to 1,500 ft.

It was permitted by Jones CO. and has since transferred to Van Operating Ltd. on the wellbore schedule.

Completion filings report 10 formation tops, including B/Dothan, Dot, Saddle Creek, T/Saddle Crk.

Its lease has reported 326K barrels of oil and 697 mcf of gas since January 1993, last reporting in June 2022. The lease carries 23 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Permitted by Jones Co.; the EWA schedule now lists a different operator.

Based in
Albany, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 28, 2021
Permits on file
96
Phone
(325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Oct 2020
Latest permitJones Co.Sep 13, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,500
total depth, ft
1
permits on file
Sep 13, 1985
last permit issued
Jun 26, 1998
completed
326K
cumulative oil, bbl
697
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 1998
Shut in
—
Plugged
Jul 30, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail "M" O-8-22523Nail (Cook, Upper)Van Operating, Ltd.23326K697Jan 1993 – Jun 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Oct 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
284982-99DrillJones Co.Sep 12, 1985Sep 13, 1985—1,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-22523————

Formation tops

As filed on W-2/G-1. Subsea from 1,406 ft elevation.Download CSV →

FormationMD ftSubsea
B/Dothan920486
Dot920486
Saddle Creek1,196210
T/Saddle CRK1,196210
B/Cool1,274132
Cool1,274132
Flippen Sand1,280126
T/Flippen1,280126
Cook Sand1,31195
T/Cook Sd.1,31195

Perforations

Perforated and open-hole intervals.

FromToType
1,2831,287Perforated
1,2831,301Perforated
1,2981,301Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.2590 S
4.51,3897.875280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 16, 1998Aug 19, 1998—
00Oct 24, 1985Oct 7, 1985Yes
00Oct 16, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.74M
bbl, all reported
Jun 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088034H-1 InjectionPlugged Aug 12, 20196006301,283–1,301

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41736559, documented in the API reference.