TEXAS · WELLS · SHACKELFORD COUNTY · NAIL WB LEASE · API 42-417-36906 · DISTRICT 6E
Nail WB #3
Shackelford County · Shackelford County Regular field · Vertical
Nail WB #3 (API 42-417-36906) is a plugged well in Shackelford County, plugged December 28, 2006, last operated by Jacobs C. E. CO..
The RRC has issued one drilling permit, issued June 3, 1986, permitted to 1,999 ft.
Completion filings report 4 formation tops, including C/Junction Ls, Dotham Ls, Breckenridge Ls, Swastika Ss.
Its lease has reported 44.7K barrels of oil and 40.7K mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Albany, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 20, 2021
- Permits on file
- 356
- Phone
- (325) 762-3301
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jacobs C. E. Co. |
| Production reports | Jacobs, C. E., Co.through Sep 2019 |
| Latest permit | Jacobs, C. E., Co.Jun 3, 1986 |
- 1,999
- total depth, ft
- 1
- permits on file
- Jun 3, 1986
- last permit issued
- Jun 24, 1986
- completed
- 44.7K
- cumulative oil, bbl
- 40.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1993 THROUGH Sep 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 24, 1986
- Shut in
- —
- Plugged
- Dec 28, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail WB O-8-23899 | Shackelford County Regular | Jacobs, C. E., Co. | 3 | 44.7K | 40.7K | Jan 1993 – Sep 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jacobs, C. E., Co.Nov 1993 → Sep 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 302814-99 | Drill | Jacobs, C. E., Co. | Jun 2, 1986 | Jun 3, 1986 | — | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 24, 1986 | Nail WB O-8-23899 | Shackelford County Regular | Jacobs C. E. Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,613 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| C/Junction LS | 763 | 850 |
| Dotham LS | 1,046 | 567 |
| Breckenridge LS | 1,546 | 67 |
| Swastika SS | 1,705 | -92 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,724 | 1,731 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 101 | 11 | 75 S |
| 4.5 | 1,747 | 7.875 | 110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 2, 1986 | Aug 14, 1986 | Yes |
| 00 | Aug 22, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-36906 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-36906 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41736906, documented in the API reference.