WELL · 42-417-37930 · DISTRICT 7
Nail-Monroe #6S
Shackelford County · Nail-Monroe (Hope Sand) field · Vertical
Nail-Monroe #6S (API 42-417-37930) is a plugged well in Shackelford County, plugged February 19, 2009, last operated by Stasney H. R. & Sons Ltd..
The RRC has issued one drilling permit (amended once), issued April 21, 1995, permitted to 1,999 ft.
It was permitted by Breck Operating Corp. and has since transferred to Stasney H. R. & Sons Ltd. on the wellbore schedule.
Completion filings report 2 formation tops, including Tannehill, Hope Sand.
Its lease has reported 5.65K barrels of oil and 7.83K mcf of gas since November 1994, last reporting in March 2009. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Breck Operating Corp.; the EWA schedule now lists a different operator.
- Based in
- Albany, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 24, 2012
- Permits on file
- 257
- Phone
- (325) 762-3311
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stasney H. R. & Sons Ltd. |
| Production reports | Stasney, H. R. & Sons, Ltd.through Aug 2006 |
| Latest permit | Breck Operating Corp.Apr 21, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 2
- permits on file
- Apr 21, 1995
- last permit issued
- Sep 7, 1995
- completed
- 5.65K
- cumulative oil, bbl
- 7.83K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1994 THROUGH Mar 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 7, 1995
- Shut in
- —
- Plugged
- Feb 19, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail-Monroe O-8-27429 | Nail-Monroe (Hope Sand) | Stasney, H. R. & Sons, Ltd. | 2 | 5.65K | 7.83K | Nov 1994 – Mar 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Breck Operating Corp.Feb 1995 → Sep 1997
- 2Edington Oil CompanyApr 2002 → Dec 2002
- 3Stasney, H. R. & Sons, Ltd.Jan 2003 → Aug 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 435087-98 | Drill | Breck Operating Corp. | Sep 22, 1995 | Apr 21, 1995 | Apr 23, 1995 | 1,999 |
| 435087-99 | Drill | Breck Operating Corp. | Apr 21, 1995 | Apr 21, 1995 | — | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27429 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,805 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 1,294 | 511 |
| Hope Sand | 1,678 | 127 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,678 | 1,682 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 114 | 12.25 | 85 S |
| 4.5 | 1,802 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 14, 1995 | Sep 18, 1995 | Yes |
| 00 | Oct 9, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-37930 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-37930 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41737930, documented in the API reference.