TEXAS · WELLS · SHACKELFORD COUNTY · API 42-417-38029 · DISTRICT 7B

Stasney 829 #1

Plugged

Shackelford County  · Vertical

Stasney 829 #1 (API 42-417-38029) is a plugged well in Shackelford County, plugged June 5, 1996, last operated by Breck Operating Corp..

The RRC has issued 2 drilling permits between 1996 and 1997, permitted to 4,800 ft.

Operator of record

Breck Operating Corp.

Based in
Breckenridge, TX
P-5 status
Inactive (I)
P-5 last filed
May 6, 2019
Permits on file
295
Phone
(254) 559-3355

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBreck Operating Corp.Sep 19, 1997
4,800
total depth, ft
2
permits on file
Sep 19, 1997
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 5, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
467604-99ReenterBreck Operating Corp.Sep 15, 1997Sep 19, 1997—3,500
446697-99DrillEnserch Exploration, IncApr 8, 1996Apr 8, 1996May 20, 19964,800

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jul 2001
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000086956W-14 DisposalCanceled Jun 12, 20011,0001,4752,988–3,244

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120002001

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41738029, documented in the API reference.