WELL · 42-417-38082 · DISTRICT 7
Newell 58 Unit #1
Shackelford County · Albany (Mississippian) field · Vertical
Newell 58 Unit #1 (API 42-417-38082) is a plugged well in Shackelford County, plugged July 12, 2019, last operated by Van Operating Ltd..
The RRC has issued one drilling permit, issued October 21, 1996, permitted to 5,000 ft.
Completion filings report 3 formation tops, including B/Caddo, T/Congl, T/Chappel.
Its 2 leases have reported 295 barrels of oil and 477K mcf of gas since February 1997, last reporting in May 2022. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Albany, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 28, 2021
- Permits on file
- 96
- Phone
- (325) 762-3353
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Van Operating Ltd. |
| Production reports | Van Operating, Ltd.through Dec 2015 |
| Latest permit | Van Operating, Ltd.Oct 21, 1996 |
- 5,000
- total depth, ft
- 1
- permits on file
- Oct 21, 1996
- last permit issued
- Feb 24, 1997
- completed
- 295
- cumulative oil, bbl
- 477K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1997 THROUGH May 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 24, 1997
- Shut in
- —
- Plugged
- Jul 12, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Newell "58" Unit G-8-162881 | Albany (Mississippian) | Van Operating, Ltd. | 1 | 0 | 458K | Mar 1997 – May 2022 |
| Newell "58" Unit O-8-28113 | Albany (Mississippian) | Van Operating, Ltd. | 1 | 295 | 19.3K | Feb 1997 – Oct 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Van Operating, Ltd.Feb 1997 → Dec 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 453992-99 | Drill | Van Operating, Ltd. | Oct 17, 1996 | Oct 21, 1996 | Dec 27, 1996 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-162881 | — | — | — | — |
| — | — O-8-28113 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,562 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Caddo | 4,412 | -2,850 |
| T/Congl | 4,454 | -2,892 |
| T/Chappel | 4,520 | -2,958 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,718 | 4,738 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 605 | 11 | 200 S |
| 4.5 | 4,809 | 7.875 | 380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 1997 | Apr 29, 1997 | — |
| 00 | May 29, 1997 | — | — |
| 00 | May 5, 1997 | Mar 11, 1997 | Yes |
| 00 | Apr 4, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38082 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38082 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738082, documented in the API reference.