TEXAS · WELLS · SHACKELFORD COUNTY · NAIL RANCH "41B" LEASE · API 42-417-38083 · DISTRICT 6E

Nail Ranch 41B #12S

Plugged

Shackelford County · Jumpstart (Lower Frye) field  · Vertical

Nail Ranch 41b #12S (API 42-417-38083) is a plugged well in Shackelford County, plugged June 29, 2016, last operated by Daylight Petroleum LLC.

The RRC has issued one drilling permit, issued October 21, 1996, permitted to 2,000 ft.

It was permitted by L.C.S. Production Company and has since transferred to Daylight Petroleum LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Lower Frye, Stockwether, Cook.

Its lease has reported 193K barrels of oil and 8.68K mcf of gas since May 1996, last reporting volume in April 2026. The lease carries 12 wells, so these are lease totals, not this well alone.

Operator of record

Daylight Petroleum LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 7, 2026
Permits on file
7
Phone
(281) 601-9288

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDaylight Petroleum LLC
Production reportsDaylight Petroleum LLCthrough Apr 2026
Latest permitL.C.S. Production CompanyOct 21, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Oct 21, 1996
last permit issued
Nov 29, 1996
completed
193K
cumulative oil, bbl
8.68K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 29, 1996
Shut in
—
Plugged
Jun 29, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail Ranch "41B" O-8-27853Jumpstart (Lower Frye)Daylight Petroleum LLC12193K8.68KMay 1996 – Apr 2026

Oil, barrels lease total

Last 12 months 722 · prior 12 240(+201%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyMay 1996 → Feb 1998
  2. 2T-N-T Engineering, Inc.Mar 1998 → Jun 2016
  3. 3Avad Operating, LLCJul 2016 → Jul 2019
  4. 4Daylight Petroleum LLCAug 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
453988-99DrillL.C.S. Production CompanyOct 17, 1996Oct 21, 1996Oct 22, 19962,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 29, 1996Nail Ranch 41B O-8-27853Jumpstart (Lower Frye)Daylight Petroleum LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,487 ft elevation.Download CSV →

FormationMD ftSubsea
Lower Frye884603
Stockwether916571
Cook1,100387

Perforations

Perforated and open-hole intervals.

FromToType
891894Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,1556.75170 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 10, 1997Dec 10, 1996Yes
00Jan 17, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41738083, documented in the API reference.