TEXAS · WELLS · SHACKELFORD COUNTY · NAIL RANCH "19" LEASE · API 42-417-38197 · DISTRICT 6E

Nail Ranch 19 #5S

Shut in

Shackelford County · Jumpstart N. (L. Frye) field · Shut In  · Vertical

Nail Ranch 19 #5S (API 42-417-38197) is a well in Shackelford County operated by Daylight Petroleum LLC, completed May 12, 1998 and listed as shut in on the RRC schedule, shut in March 1, 2024.

The RRC has issued one drilling permit, issued April 14, 1998, permitted to 1,119 ft.

It was permitted by T-N-T Engineering, Inc. and has since transferred to Daylight Petroleum LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Dothan Lm., Stockweather Lm..

Its lease has reported 213K barrels of oil and 10.3K mcf of gas since May 1998, last reporting volume in April 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Daylight Petroleum LLC

Permitted by T-N-T Engineering, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 7, 2026
Permits on file
7
Phone
(281) 601-9288

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDaylight Petroleum LLC
Production reportsDaylight Petroleum LLCthrough Apr 2026
Latest permitT-N-T Engineering, Inc.Apr 14, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,119
total depth, ft
1
permits on file
Apr 14, 1998
last permit issued
May 12, 1998
completed
213K
cumulative oil, bbl
10.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1998 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 12, 1998
Shut in
Mar 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail Ranch "19" O-8-28489Jumpstart, N. (L. Frye)Daylight Petroleum LLC8213K10.3KMay 1998 – Apr 2026

Oil, barrels lease total

Last 12 months 2,518 · prior 12 2,822(-11%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1T-N-T Engineering, Inc.May 1998 → Jun 2016
  2. 2Avad Operating, LLCJul 2016 → Jul 2019
  3. 3Daylight Petroleum LLCMar 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
475054-99DrillT-N-T Engineering, Inc.Apr 6, 1998Apr 14, 1998May 5, 19982,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 12, 1998Nail Ranch 19 O-8-28489Jumpstart N. (L. Frye)Daylight Petroleum LLCShut In · shut in Mar 1, 20241,119

Formation tops

As filed on W-2/G-1. Subsea from 1,409 ft elevation.Download CSV →

FormationMD ftSubsea
Dothan Lm.623786
Stockweather Lm.861548

Perforations

Perforated and open-hole intervals.

FromToType
816834Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,1096.75175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 18, 1998Jun 17, 1998Yes
00Jul 24, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089628H-1 InjectionNot activated1,000710816–834

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41738197, documented in the API reference.