WELL · 42-417-38245 · DISTRICT 7

Nail Ranch 42B #5S

Plugged

Shackelford County · Jumpstart (Lower Cook) field  · Vertical

Nail Ranch 42b #5S (API 42-417-38245) is a plugged well in Shackelford County, plugged July 26, 2018, last operated by Daylight Petroleum LLC.

The RRC has issued one drilling permit, issued September 17, 1999, permitted to 2,000 ft.

It was permitted by T-N-T Engineering, Inc. and has since transferred to Daylight Petroleum LLC on the wellbore schedule.

Completion filings report one formation top, including Top Lower Cook.

Its lease has reported 159K barrels of oil and 9.16K mcf of gas since April 1997, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Daylight Petroleum LLC

Permitted by T-N-T Engineering, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Apr 7, 2026
Permits on file
7
Phone
(281) 601-9288

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDaylight Petroleum LLC
Production reportsDaylight Petroleum LLCthrough Mar 2026
Latest permitT-N-T Engineering, Inc.Sep 17, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Sep 17, 1999
last permit issued
Oct 15, 1999
completed
159K
cumulative oil, bbl
9.16K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 15, 1999
Shut in
—
Plugged
Jul 26, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail Ranch 42B O-8-28176Jumpstart (Lower Cook)Daylight Petroleum LLC4159K9.16KApr 1997 – Jul 2026

Oil, barrels lease total

Last 12 months 225 · prior 12 372(-40%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyApr 1997 → Feb 1998
  2. 2T-N-T Engineering, Inc.Mar 1998 → Jun 2016
  3. 3Avad Operating, LLCJul 2016 → Jul 2019
  4. 4Daylight Petroleum LLCDec 2019 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
487573-99DrillT-N-T Engineering, Inc.Sep 14, 1999Sep 17, 1999Sep 27, 19992,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28176————

Formation tops

As filed on W-2/G-1. Subsea from 1,373 ft elevation.Download CSV →

FormationMD ftSubsea
Top Lower Cook992381

Perforations

Perforated and open-hole intervals.

FromToType
992997Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510611.12580 S
4.51,0726.75135 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 4, 2000Jan 18, 2000Yes
00Jan 27, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jun 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000085950H-1 InjectionPlugged Aug 8, 20181,100495992–997
000092591H-1 InjectionCanceled Sep 25, 20091,100495992–997

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41738245, documented in the API reference.