WELL · 42-417-38270 · DISTRICT 7
Nail Ranch 20 #15
Shackelford County · Jumpstart (Lower Cook) field · Producing · Vertical
Nail Ranch 20 #15 (API 42-417-38270) is a well in Shackelford County operated by Daylight Petroleum LLC, completed March 24, 2000 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 10, 2000, permitted to 2,000 ft.
It was permitted by T-N-T Engineering, Inc. and has since transferred to Daylight Petroleum LLC on the wellbore schedule.
Completion filings report one formation top, including Flippen.
Its lease has reported 651K barrels of oil and 87.7K mcf of gas since November 1997, last reporting in July 2026. The lease carries 23 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by T-N-T Engineering, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 7, 2026
- Permits on file
- 7
- Phone
- (281) 601-9288
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Daylight Petroleum LLC |
| Production reports | Daylight Petroleum LLCthrough Apr 2026 |
| Latest permit | T-N-T Engineering, Inc.Mar 10, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Mar 10, 2000
- last permit issued
- Mar 24, 2000
- completed
- 651K
- cumulative oil, bbl
- 87.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 24, 2000
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 23 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail Ranch "20" O-8-28310 | Jumpstart (Lower Cook) | Daylight Petroleum LLC | 23 | 651K | 87.7K | Nov 1997 – Jul 2026 |
Oil, barrels lease total
Last 12 months 4,227 · prior 12 4,918(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1L.C.S. Production CompanyNov 1997 → Feb 1998
- 2T-N-T Engineering, Inc.Mar 1998 → Jun 2016
- 3Avad Operating, LLCJul 2016 → Jul 2019
- 4Daylight Petroleum LLCAug 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 492909-99 | Drill | T-N-T Engineering, Inc. | Mar 9, 2000 | Mar 10, 2000 | Mar 13, 2000 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28310 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,492 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Flippen | 1,026 | 466 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,116 | 1,123 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,170 | 6.75 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 1, 2000 | Apr 18, 2000 | Yes |
| 00 | May 9, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38270 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38270 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738270, documented in the API reference.