TEXAS · WELLS · SHACKELFORD COUNTY · DAVIS "B" LEASE · API 42-417-38635 · DISTRICT 6E
Davis B #7616
Shackelford County · Windham West (3400) field · Temp Abandoned · Vertical
Davis B #7616 (API 42-417-38635) is a permitted well in Shackelford County filed by L.C.S. Production Company; no completion report is on file yet.
The RRC has issued one drilling permit, issued September 20, 2006, permitted to 3,446 ft.
It was permitted by L.C.S. Production Company and has since transferred to Grayrock Energy II LLC on the wellbore schedule.
Completion filings report one formation top, including Morris Sand.
Operator of record
Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Phone
- (214) 234-9115
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Grayrock Energy II LLC |
| Production reports | Rover Petroleum Operating, LLCthrough Oct 2022 |
| Latest permit | L.C.S. Production CompanySep 20, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,446
- total depth, ft
- 1
- permits on file
- Sep 20, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 95.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- —
- Shut in
- Nov 1, 2022
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis "B" G-8-223238 | Windham, West (3400) | Grayrock Energy II, LLC | 1 | 0 | 95.6K | Nov 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1L.C.S. Production CompanyNov 2006 → Apr 2009
- 2Plantation Operating, LLCMay 2009 → Nov 2011
- 3Merit Energy CompanyDec 2011 → May 2017
- 4Rover Petroleum Operating, LLCJul 2017 → Oct 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 625967-99 | Drill | L.C.S. Production Company | Sep 14, 2006 | Sep 20, 2006 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Davis B G-8-223238 | Windham West (3400) | Grayrock Energy II LLC | Temp Abandoned · shut in Nov 1, 2022 | 3,446 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,412 | 3,426 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 130 | 12.25 | 755 S |
| 4.5 | 3,616 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 20, 2007 | — | Yes |
| 00 | Dec 15, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38635 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38635 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738635, documented in the API reference.