TEXAS · WELLS · SHACKELFORD COUNTY · MUSSELMAN CADDO UNIT LEASE · API 42-417-80017 · DISTRICT 6E
Musselman Caddo Unit #12
Shackelford County · Musselman (Caddo) field · Vertical
Musselman Caddo Unit #12 (API 42-417-80017) is a plugged well in Shackelford County, plugged March 3, 2026, last operated by Momentum Operating CO. Inc..
The RRC has issued one drilling permit, issued June 24, 1985, permitted to 3,620 ft.
It was permitted by Westland Oil Development Corp. and has since transferred to Momentum Operating CO. Inc. on the wellbore schedule.
Its lease has reported 129K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Permitted by Westland Oil Development Corp.; the EWA schedule now lists a different operator.
- Based in
- Albany, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 4, 2025
- Permits on file
- 148
- Phone
- (325) 762-2366
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Momentum Operating Co. Inc. |
| Production reports | Momentum Operating Co., Inc.through May 2007 |
| Latest permit | Westland Oil Development Corp.Jun 24, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,620
- total depth, ft
- 1
- permits on file
- Jun 24, 1985
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 129K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Mar 3, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Musselman Caddo Unit G-8-17788 | Musselman (Caddo) | Momentum Operating Co., Inc. | 1 | 0 | 129K | Jan 1993 – May 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jones Company, Ltd.Jan 1993 → May 1995
- 2Van Operating, Ltd.Aug 1995 → Jan 2007
- 3Quest Emg, Inc.Feb 2007 → May 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 278567-99 | Drill | Westland Oil Development Corp. | Jun 24, 1985 | Jun 24, 1985 | — | 3,620 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Musselman Caddo Unit G-8-17788 | Musselman (Caddo) | Momentum Operating Co. Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,385 | 3,620 | Open hole |
| 3,612 | 3,560 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 5.188 | 3,382 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 16, 1985 | Aug 9, 1985 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-80017 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-80017 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Apr 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000063220 | H-1 Injection | Plugged Mar 12, 2026 | 1,000 | 1,500 | 3,525–3,590 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41780017, documented in the API reference.