TEXAS · WELLS · SHELBY COUNTY · USA-ELLINGTON LEASE · API 42-419-30954 · DISTRICT 06

USA-Ellington #2H

Shut in

Shelby County · Bridges E. (James Lime) field · Temp Abandoned  · Horizontal

USA-Ellington #2H (API 42-419-30954) is a horizontal well in Shelby County operated by Silver Hill Energy Operating LLC, completed December 4, 2004 and listed as temp abandoned on the RRC schedule, shut in July 1, 2026.

The RRC has issued one drilling permit, issued July 21, 2004, permitted to 6,381 ft.

It was permitted by Marathon Oil Company and has since transferred to Silver Hill Energy Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Rodessa, Bexar, James Lime.

Its lease has reported 6.5K barrels of oil and 2.84M mcf of gas since December 2004, last reporting volume in March 2026.

Operator of record

Silver Hill Energy Operating LLC

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Mar 19, 2026
Permits on file
215
Phone
(214) 865-6555

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSilver Hill Energy Operating LLC
Production reportsSilver Hill Energy Operating LLCthrough Mar 2026
Latest permitMarathon Oil CompanyJul 21, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,381
total depth, ft
1
permits on file
Jul 21, 2004
last permit issued
Dec 4, 2004
completed
6.5K
cumulative oil, bbl
2.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 4, 2004
Shut in
Jul 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
USA-Ellington G-6-208207Bridges, E. (James Lime)Silver Hill Energy Operating LLC16.5K2.84MDec 2004 – Mar 2026

Gas, mcf lease total

Last 12 months 819 · prior 12 3,222(-75%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyDec 2004 → Aug 2015
  2. 2Legacy Reserves Operating LPSep 2015 → Sep 2023
  3. 3Silver Hill Energy Operating LLCOct 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
548529-99DrillMarathon Oil CompanyJul 21, 2004Jul 21, 2004—6,410

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 4, 2004USA-Ellington G-6-208207Bridges E. (James Lime)Silver Hill Energy Operating LLCTemp Abandoned · shut in Jul 1, 20266,381

Formation tops

As filed on W-2/G-1. Subsea from 278 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,740-5,462
Bexar6,238-5,960
James LimeJAMES6,557-6,279

Perforations

Perforated and open-hole intervals.

FromToType
6,62711,663Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,34512.25520 S
76,6278.751,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 20, 2005Feb 2, 2005Yes
00May 16, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41930954, documented in the API reference.