TEXAS · WELLS · SHELBY COUNTY · MORRISON-DAVIS LEASE · API 42-419-31161 · DISTRICT 06

Morrison-Davis #1H

Y

Shelby County · Huxley (6100) field · Producing  · Horizontal

Morrison-Davis #1H (API 42-419-31161) is a horizontal well in Shelby County operated by Xto Energy Inc., completed August 3, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 8, 2007, permitted to 6,767 ft.

It was permitted by Hunt Petroleum Corporation and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Austin Chalk, Fredericksburg, Massive Anhydrite (marker), James Lime.

Its lease has reported 79 barrels of oil and 1.11M mcf of gas since August 2007, last reporting volume in April 2026.

Operator of record

XTO Energy Inc.

Permitted by Hunt Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitHunt Petroleum CorporationJun 8, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,767
total depth, ft
1
permits on file
Jun 8, 2007
last permit issued
Aug 3, 2007
completed
79
cumulative oil, bbl
1.11M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 3, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrison-Davis G-6-231915Huxley (6100)XTO Energy Inc.1791.11MAug 2007 – Apr 2026

Gas, mcf lease total

Last 12 months 22,103 · prior 12 19,621(+13%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hunt Petroleum CorporationAug 2007 → Nov 2008
  2. 2XTO Energy Inc.Dec 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
639770-99DrillHunt Petroleum CorporationMay 29, 2007Jun 8, 2007Jun 16, 20076,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 3, 2007Morrison-Davis G-6-231915Huxley (6100)XTO Energy Inc.Producing6,767

Formation tops

As filed on W-2/G-1. Subsea from 372 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,339-2,967
Fredericksburg3,755-3,383
Massive Anhydrite (marker)MASSIVE ANHYDRITE5,812-5,440
James Lime6,746-6,374

Perforations

Perforated and open-hole intervals.

FromToType
6,94812,780Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,10413.5920 S
7.6256,9249.875975 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 14, 2008Oct 3, 2007Yes
00Jan 2, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931161, documented in the API reference.