WELL · 42-419-31163 · DISTRICT 6

Bickham Unit #2H

Y

Shelby County · Huxley (6100) field · Temp Abandoned  · Horizontal

Bickham Unit #2H (API 42-419-31163) is a horizontal well in Shelby County operated by Ellora Energy Inc., completed June 17, 2008 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended 3 times), issued June 20, 2007, permitted to 7,000 ft.

It was permitted by Ellora Operating, L.P. and has since transferred to Ellora Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Massive Anhydrite (marker), Rodessa, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Ellora Energy Inc.

Permitted by Ellora Operating, L.P.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 17, 2026
Permits on file
1
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEllora Energy Inc.
Production reportsEllora Energy Inc.through Nov 2011
Latest permitEllora Operating, L.P.Jun 20, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
4
permits on file
Jun 20, 2007
last permit issued
Jun 17, 2008
completed
0
cumulative oil, bbl
207K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 17, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bickham Unit G-6-238756Huxley (6100)Ellora Energy Inc.10207KJun 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ellora Operating, L.P.Jun 2008 → Jul 2011
  2. 2Ellora Energy Inc.Aug 2011 → Nov 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
640258-96DrillEllora Operating, L.P.Aug 29, 2008Jun 20, 2007Apr 29, 20087,000
640258-97DrillEllora Operating, L.P.May 8, 2008Jun 20, 2007Apr 29, 20087,000
640258-98DrillEllora Operating, L.P.Sep 20, 2007Jun 20, 2007Apr 29, 20087,000
640258-99DrillEllora Operating, L.P.Jun 6, 2007Jun 20, 2007—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-238756————

Formation tops

As filed on W-2/G-1. Subsea from 363 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE5,386-5,023
Rodessa5,548-5,185
James Lime6,090-5,727

Perforations

Perforated and open-hole intervals.

FromToType
6,5188,115Perforated
6,55313,715Perforated
6,6268,208Perforated
8,4409,879Perforated
9,34413,674Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,03512.25935 S
76,5188.75350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 25, 2008Aug 11, 2008Yes
00Sep 12, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931163, documented in the API reference.