WELL · 42-419-31487 · DISTRICT 6

Pearson #1

Plugged

Shelby County · Stockman (Travis Peak) field  · Directional

Pearson #1 (API 42-419-31487) is a plugged well in Shelby County, plugged November 13, 2015, last operated by Tanos Exploration II LLC.

The RRC has issued 2 drilling permits (amended once) between 2009 and 2010, permitted to 15,000 ft.

It was permitted by Unit Petroleum Company and has since transferred to Tanos Exploration II LLC on the wellbore schedule.

Completion filings report 5 formation tops, including James Lime, Pettit, Travis Peak, Bossier.

Operator of record

Tanos Exploration II LLC

Permitted by Unit Petroleum Company; the EWA schedule now lists a different operator.

Based in
Tyler, TX
P-5 status
Inactive (I)
P-5 last filed
May 19, 2023
Permits on file
236
Phone
(903) 597-7667

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTanos Exploration II LLC
Production reportsTanos Exploration II, LLCthrough Jun 2015
Latest permitUnit Petroleum CompanyOct 12, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
3
permits on file
Oct 12, 2010
last permit issued
Aug 19, 2010
completed
0
cumulative oil, bbl
5.03K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2009 THROUGH Nov 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 19, 2010
Shut in
—
Plugged
Nov 13, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pearson G-6-260790Stockman (Travis Peak)Tanos Exploration II, LLC105.03KAug 2010 – Nov 2015
Pearson G-6-256675WildcatUnit Petroleum Company100Oct 2009 – Aug 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyAug 2010 → Sep 2013
  2. 2Fortune Resources LLCMar 2014 → Jul 2014
  3. 3Tanos Exploration II, LLCAug 2014 → Jun 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
701177-99RecompletionUnit Petroleum CompanyAug 24, 2010Oct 12, 2010Aug 17, 200915,000
682966-98DrillBurk Royalty Co., Ltd.Sep 8, 2009Jul 14, 2009Aug 17, 200915,000
682966-99DrillBurk Royalty Co., Ltd.Jul 11, 2009Jul 14, 2009—15,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-256675————
—— G-6-260790————

Formation tops

As filed on W-2/G-1. Subsea from 503 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES LIMESTONE6,705-6,202
Pettit6,994-6,491
Travis Peak7,666-7,163
BossierBOSSIER SHALE10,864-10,361
Cotton ValleyCOTTON VALLEY LIME12,097-11,594

Perforations

Perforated and open-hole intervals.

FromToType
7,6607,674Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,61717.51,485 S
9.6255,21012.25650 S
5.512,2008.751,434 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 16, 2011Dec 10, 2010—
00Aug 3, 2010May 10, 2010Yes
00Jul 28, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931487, documented in the API reference.