WELL · 42-419-31510 · DISTRICT 6
Haley #1
Shelby County · Bobo South (James) field · Vertical
Haley #1 (API 42-419-31510) is a plugged well in Shelby County, plugged October 11, 2012, last operated by Unit Petroleum Company.
The RRC has issued 2 drilling permits between 2009 and 2010, permitted to 15,000 ft.
Completion filings report 7 formation tops, including James Lime, Pettit, Travis Peak, Cotton Valley.
Operator of record
- Based in
- Tulsa, OK
- P-5 status
- Active (A)
- P-5 last filed
- Jan 13, 2025
- Permits on file
- 1,100
- Phone
- (918) 493-7700
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Unit Petroleum Company |
| Production reports | Unit Petroleum Companythrough Aug 2011 |
| Latest permit | Unit Petroleum CompanyDec 3, 2010 |
- 15,000
- total depth, ft
- 2
- permits on file
- Dec 3, 2010
- last permit issued
- Oct 7, 2010
- completed
- 0
- cumulative oil, bbl
- 11.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2009 THROUGH Oct 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 7, 2010
- Shut in
- —
- Plugged
- Oct 11, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haley G-6-256739 | Wildcat | Unit Petroleum Company | 1 | 0 | 0 | Dec 2009 – Oct 2012 |
| Haley G-6-267335 | Bobo South (James) | Unit Petroleum Company | 1 | 0 | 11.6K | Oct 2010 – Oct 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Unit Petroleum CompanyOct 2010 → Aug 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 706034-99 | Recompletion | Unit Petroleum Company | Nov 29, 2010 | Dec 3, 2010 | Nov 6, 2009 | 7,000 |
| 685864-99 | Drill | Unit Petroleum Company | Oct 6, 2009 | Oct 15, 2009 | Nov 6, 2009 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-256739 | — | — | — | — |
| — | — G-6-267335 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 375 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES LIMESTONE | 6,351 | -5,976 |
| PettitPETTET | 6,638 | -6,263 |
| Travis Peak | 7,238 | -6,863 |
| Travis Peak | 7,328 | -6,953 |
| Cotton Valley | 9,235 | -8,860 |
| BossierBOSSIER SHALE | 10,434 | -10,059 |
| HaynesvilleHAYNESVILLE SHALE | 11,512 | -11,137 |
| Cotton ValleyCOTTON VALLEY LIME | 11,635 | -11,260 |
| CVL | 11,635 | -11,260 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,414 | 6,454 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,200 | 17.5 | 1,015 S |
| 9.625 | 4,263 | 12.25 | 415 S |
| 6 | 11,800 | 8.75 | 615 S |
| 5.5 | 11,800 | 8.75 | 615 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 1, 2013 | Jan 10, 2011 | — |
| 00 | Aug 24, 2010 | May 24, 2010 | Yes |
| 00 | Aug 4, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-31510 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-31510 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41931510, documented in the API reference.