WELL · 42-419-31510 · DISTRICT 6

Haley #1

Plugged

Shelby County · Bobo South (James) field  · Vertical

Haley #1 (API 42-419-31510) is a plugged well in Shelby County, plugged October 11, 2012, last operated by Unit Petroleum Company.

The RRC has issued 2 drilling permits between 2009 and 2010, permitted to 15,000 ft.

Completion filings report 7 formation tops, including James Lime, Pettit, Travis Peak, Cotton Valley.

Operator of record

Unit Petroleum Company

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 13, 2025
Permits on file
1,100
Phone
(918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsUnit Petroleum Companythrough Aug 2011
Latest permitUnit Petroleum CompanyDec 3, 2010
15,000
total depth, ft
2
permits on file
Dec 3, 2010
last permit issued
Oct 7, 2010
completed
0
cumulative oil, bbl
11.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2009 THROUGH Oct 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 7, 2010
Shut in
—
Plugged
Oct 11, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haley G-6-256739WildcatUnit Petroleum Company100Dec 2009 – Oct 2012
Haley G-6-267335Bobo South (James)Unit Petroleum Company1011.6KOct 2010 – Oct 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyOct 2010 → Aug 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
706034-99RecompletionUnit Petroleum CompanyNov 29, 2010Dec 3, 2010Nov 6, 20097,000
685864-99DrillUnit Petroleum CompanyOct 6, 2009Oct 15, 2009Nov 6, 200915,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-256739————
—— G-6-267335————

Formation tops

As filed on W-2/G-1. Subsea from 375 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES LIMESTONE6,351-5,976
PettitPETTET6,638-6,263
Travis Peak7,238-6,863
Travis Peak7,328-6,953
Cotton Valley9,235-8,860
BossierBOSSIER SHALE10,434-10,059
HaynesvilleHAYNESVILLE SHALE11,512-11,137
Cotton ValleyCOTTON VALLEY LIME11,635-11,260
CVL11,635-11,260

Perforations

Perforated and open-hole intervals.

FromToType
6,4146,454Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,20017.51,015 S
9.6254,26312.25415 S
611,8008.75615 S
5.511,8008.75615 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 1, 2013Jan 10, 2011—
00Aug 24, 2010May 24, 2010Yes
00Aug 4, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931510, documented in the API reference.