TEXAS · WELLS · SHELBY COUNTY · HURST LEASE · API 42-419-31545 · DISTRICT 06

Hurst #1H

Shut in

Shelby County · Carthage (Haynesville Shale) field · Producing  · Horizontal

Hurst #1H (API 42-419-31545) is a horizontal well in Shelby County operated by Rockcliff Energy Operating Iii, completed May 6, 2010 and listed as producing on the RRC schedule, shut in August 1, 2026.

The RRC has issued one drilling permit, issued February 2, 2010, permitted to 11,914 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Rockcliff Energy Operating Iii on the wellbore schedule.

Completion filings report 3 formation tops, including Travis Peak, Bossier, Haynesville.

No lease production has been reported under this well’s leases.

Operator of record

Rockcliff Energy Operating III

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 31, 2025
Permits on file
64
Phone
(713) 351-0500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRockcliff Energy Operating III
Production reportsRockcliff Energy Operating IIIthrough Jan 2026
Latest permitChesapeake Operating, Inc.Feb 2, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,914
total depth, ft
1
permits on file
Feb 2, 2010
last permit issued
May 6, 2010
completed
0
cumulative oil, bbl
2.02M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 6, 2010
Shut in
Aug 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hurst G-6-256920Carthage (Haynesville Shale)Rockcliff Energy Operating III102.02MMay 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 22,287 · prior 12 27,460(-19%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Oct 2010 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Dec 2014
  3. 3SND Operating, L.L.C.Jan 2015 → Sep 2017
  4. 4Weatherly Oil & Gas, LLCOct 2017 → May 2019
  5. 5Shelby Boswell Operator, LLCJun 2019 → Dec 2025
  6. 6Rockcliff Energy Operating IIIJan 2026 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
690453-99DrillChesapeake Operating, Inc.Jan 28, 2010Feb 2, 2010Mar 30, 201020,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 6, 2010Hurst G-6-256920Carthage (Haynesville Shale)Rockcliff Energy Operating IIIProducing · shut in Aug 1, 202611,914

Formation tops

As filed on W-2/G-1. Subsea from 300 ft elevation.Download CSV →

FormationMD ftSubsea
Travis Peak7,313-7,013
Bossier10,326-10,026
HaynesvilleHAYNESVILLE SHALE11,754-11,454

Perforations

Perforated and open-hole intervals.

FromToType
11,99717,986Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,86017.51,440 S
7.62511,2409.875825 S
5.518,0826.75600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 17, 2012Mar 3, 2011—
00Aug 18, 2010Jul 8, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931545, documented in the API reference.