TEXAS · WELLS · SHELBY COUNTY · CHRISTINE LEASE · API 42-419-31606 · DISTRICT 06

Christine #1H

Y

Shelby County · Carthage (Haynesville Shale) field · Producing  · Horizontal

Christine #1H (API 42-419-31606) is a horizontal well in Shelby County operated by Apex Natural Gas LLC, completed June 13, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued June 25, 2010, permitted to 12,294 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Apex Natural Gas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Rodessa, Cotton Valley, Haynesville.

No lease production has been reported under this well’s leases.

Operator of record

Apex Natural Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 9, 2025
Permits on file
108
Phone
(713) 780-9494

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApex Natural Gas LLC
Production reportsApex Natural Gas, LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Jun 25, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,294
total depth, ft
2
permits on file
Jun 25, 2010
last permit issued
Jun 13, 2011
completed
0
cumulative oil, bbl
2.32M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 13, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Christine G-6-260887Carthage (Haynesville Shale)Apex Natural Gas, LLC102.32MOct 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 81,482 · prior 12 23,662(+244%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jun 2011 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Dec 2014
  3. 3SND Operating, L.L.C.Jan 2015 → Sep 2017
  4. 4Weatherly Oil & Gas, LLCOct 2017 → May 2019
  5. 5Shelby Boswell Operator, LLCJun 2019 → Apr 2025
  6. 6Apex Natural Gas, LLCMay 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
698038-98DrillChesapeake Operating, Inc.Jul 14, 2011Jun 25, 2010Sep 14, 201018,000
698038-99DrillChesapeake Operating, Inc.Jun 23, 2010Jun 25, 2010Sep 14, 201018,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 13, 2011Christine G-6-260887Carthage (Haynesville Shale)Apex Natural Gas LLCProducing12,294

Formation tops

As filed on W-2/G-1. Subsea from 314 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,379-5,065
Cotton Valley10,352-10,038
Haynesville12,316-12,002

Perforations

Perforated and open-hole intervals.

FromToType
12,68017,536Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,94017.51,585 S
7.62511,7769.8751,180 S
5.517,6366.75595 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 27, 2012Jul 14, 2011—
00Sep 27, 2011Dec 1, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931606, documented in the API reference.