TEXAS · WELLS · SHELBY COUNTY · JEANNINE LEASE · API 42-419-31638 · DISTRICT 06

Jeannine #1H

Y

Shelby County · Carthage (Haynesville Shale) field · Producing  · Horizontal

Jeannine #1H (API 42-419-31638) is a horizontal well in Shelby County operated by Apex Natural Gas LLC, completed August 29, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 9, 2010, permitted to 12,546 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Apex Natural Gas LLC on the wellbore schedule.

Completion filings report 5 formation tops, including James Lime, Travis Peak, Cotton Valley, Bossier.

No lease production has been reported under this well’s leases.

Operator of record

Apex Natural Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 9, 2025
Permits on file
108
Phone
(713) 780-9494

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApex Natural Gas LLC
Production reportsApex Natural Gas, LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Dec 9, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,546
total depth, ft
2
permits on file
Dec 9, 2010
last permit issued
Aug 29, 2011
completed
0
cumulative oil, bbl
2.53M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 29, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jeannine G-6-261946Carthage (Haynesville Shale)Apex Natural Gas, LLC102.53MApr 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 69,411 · prior 12 24,341(+185%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Aug 2011 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Dec 2014
  3. 3SND Operating, L.L.C.Jan 2015 → Sep 2017
  4. 4Weatherly Oil & Gas, LLCOct 2017 → May 2019
  5. 5Shelby Boswell Operator, LLCJun 2019 → Apr 2025
  6. 6Apex Natural Gas, LLCMay 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
704309-98DrillChesapeake Operating, Inc.Feb 7, 2011Dec 9, 2010Feb 22, 201118,000
704309-99DrillChesapeake Operating, Inc.Oct 25, 2010Dec 9, 2010—18,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 29, 2011Jeannine G-6-261946Carthage (Haynesville Shale)Apex Natural Gas LLCProducing12,546

Formation tops

As filed on W-2/G-1. Subsea from 366 ft elevation.Download CSV →

FormationMD ftSubsea
James Lime6,640-6,274
Travis Peak7,773-7,407
Cotton Valley10,520-10,154
Bossier11,297-10,931
Haynesville12,375-12,009

Perforations

Perforated and open-hole intervals.

FromToType
12,85017,284Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,00017.51,545 S
7.62511,9709.8751,280 S
5.517,3866.75730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 27, 2012Sep 22, 2011—
00Jan 30, 2012May 26, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931638, documented in the API reference.