TEXAS · WELLS · SHELBY COUNTY · HAWKEYES DU LEASE · API 42-419-31641 · DISTRICT 06
Hawkeyes Du #1H
Shelby County · Carthage (Haynesville Shale) field · Producing · Horizontal
Hawkeyes Du #1H (API 42-419-31641) is a horizontal well in Shelby County operated by Xto Energy Inc., completed March 26, 2011 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued November 19, 2010, permitted to 12,457 ft.
Completion filings report 4 formation tops, including Austin Chalk, James Lime, Knowles, Haynesville.
Its lease has reported 4.03M mcf of gas since March 2011, last reporting volume in April 2026.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | XTO Energy Inc.Nov 19, 2010 |
- 12,457
- total depth, ft
- 1
- permits on file
- Nov 19, 2010
- last permit issued
- Mar 26, 2011
- completed
- 0
- cumulative oil, bbl
- 4.03M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 26, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hawkeyes Du G-6-261979 | Carthage (Haynesville Shale) | XTO Energy Inc. | 1 | 0 | 4.03M | Mar 2011 – Apr 2026 |
Gas, mcf lease total
Last 12 months 44,314 · prior 12 42,205(+5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Mar 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 705203-99 | Drill | XTO Energy Inc. | Nov 11, 2010 | Nov 19, 2010 | Dec 13, 2010 | 19,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 26, 2011 | Hawkeyes Du G-6-261979 | Carthage (Haynesville Shale) | XTO Energy Inc. | Producing | 12,457 |
Formation tops
As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 3,618 | -3,277 |
| James Lime | 6,901 | -6,560 |
| Knowles | 10,495 | -10,154 |
| Haynesville | 12,032 | -11,691 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,860 | 17,638 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,892 | 17.5 | 1,293 S |
| 9.625 | 4,900 | 12.25 | 815 S |
| 7 | 12,025 | 8.75 | 1,410 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 31, 2012 | May 31, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-31641 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-31641 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41931641, documented in the API reference.