TEXAS · WELLS · SHELBY COUNTY · RAYMOND (SL) GAS UNIT LEASE · API 42-419-31696 · DISTRICT 06
Raymond (SL) Gas Unit #2HB
Shelby County · Carthage (Haynesville Shale) field · Not Eligible for Allowable · Horizontal
Raymond (SL) Gas Unit #2HB (API 42-419-31696) is a horizontal well in Shelby County operated by Xto Energy Inc., completed March 20, 2012 and listed as not eligible for allowable on the RRC schedule, shut in March 1, 2012.
The RRC has issued one drilling permit, issued September 13, 2011, permitted to 11,685 ft.
Completion filings report 3 formation tops, including James Lime, Knowles, Haynesville.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | none |
| Latest permit | XTO Energy Inc.Sep 13, 2011 |
- 11,685
- total depth, ft
- 1
- permits on file
- Sep 13, 2011
- last permit issued
- Mar 20, 2012
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2012 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 20, 2012
- Shut in
- Mar 1, 2012
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Raymond (SL) Gas Unit G-6-265425 | Carthage (Haynesville Shale) | XTO Energy Inc. | 1 | 0 | 0 | Mar 2012 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 723635-99 | Drill | XTO Energy Inc. | Sep 6, 2011 | Sep 13, 2011 | Nov 1, 2011 | 19,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 20, 2012 | Raymond (SL) Gas Unit G-6-265425 | Carthage (Haynesville Shale) | XTO Energy Inc. | Not Eligible for Allowable · shut in Mar 1, 2012 | 11,685 |
Formation tops
As filed on W-2/G-1. Subsea from 313 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James Lime | 6,168 | -5,855 |
| Knowles | 9,897 | -9,584 |
| HaynesvilleHAYNESVILLE SHALE | 11,381 | -11,068 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,040 | 19,083 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,450 | 12.25 | 1,430 S |
| 7 | 11,162 | 8.75 | 1,035 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 4, 2012 | May 14, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-31696 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-31696 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41931696, documented in the API reference.