TEXAS · WELLS · SHERMAN COUNTY · API 42-421-00982 · DISTRICT 08

Logan -A- #1

Shut in

Sherman County · Palo Duro Creek (Red Cave) field · Temp Abandoned  · Vertical

Logan -A- #1 (API 42-421-00982) is a well in Sherman County operated by Burk Royalty CO. Ltd., completed April 13, 1994 and listed as temp abandoned on the RRC schedule, shut in November 1, 2019.

The RRC has issued one drilling permit, issued October 21, 1993, permitted to 6,576 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Completion filings report 6 formation tops, including Red Cave, Panhandle Lime, Brown Dolomite, Council Grove.

No lease production has been reported under this well’s leases.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
384
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsScout Energy Management LLCthrough Oct 2019
Latest permitPhillips Petroleum CompanyOct 21, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,576
total depth, ft
1
permits on file
Oct 21, 1993
last permit issued
Apr 13, 1994
completed
0
cumulative oil, bbl
623K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 13, 1994
Shut in
Nov 1, 2019
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Logan -A- G-14-150504Palo Duro Creek (Red Cave)Burk Royalty Co., Ltd.10623KApr 1994 – Jul 2026
Logan -A- G-14-22450Palo Duro Creek (Penn. Lime)Phillips Petroleum Company100Jan 1993 – Apr 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJun 1994 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Sep 2017
  3. 3Scout Energy Management LLCOct 2017 → Oct 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
417315-99RecompletionPhillips Petroleum CompanyOct 20, 1993Oct 21, 1993Feb 28, 19942,065

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 13, 1994Logan -A- G-14-150504Palo Duro Creek (Red Cave)Burk Royalty Co. Ltd.Temp Abandoned · shut in Nov 1, 20196,576
Apr 22, 1961Logan -A- G-14-22450Palo Duro Creek (Penn. Lime)Phillips Petroleum CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,378 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave1,6601,718
Panhandle Lime2,400978
Brown Dolomite3,016362
Council Grove3,600-222
PennsylvanianPENN4,000-622
Mississippian5,900-2,522

Perforations

Perforated and open-hole intervals.

FromToType
2,0322,050Perforated
5,3035,383Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,01011375 S
5.52,2338.625300 S
2.8755,6197.875193 S
2.8756,5157.875172 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 23, 1994Jul 7, 1994Yes
00Aug 25, 1994——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42100982, documented in the API reference.