TEXAS · WELLS · SHERMAN COUNTY · BUELOW LEASE · API 42-421-30211 · DISTRICT 08
Buelow #2
Sherman County · Texas Hugoton field · Vertical
Buelow #2 (API 42-421-30211) is a plugged well in Sherman County, plugged March 10, 2015, last operated by Conocophillips Company.
The RRC has issued one drilling permit, issued April 14, 1978, permitted to 2,950 ft.
It was permitted by Phillips Petroleum Company and has since transferred to Conocophillips Company on the wellbore schedule.
Its lease has reported 225K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 3, 2026
- Permits on file
- 3,290
- Phone
- (432) 683-7443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Conocophillips Company |
| Production reports | Conocophillips Companythrough May 2012 |
| Latest permit | Phillips Petroleum CompanyApr 14, 1978 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,950
- total depth, ft
- 1
- permits on file
- Apr 14, 1978
- last permit issued
- Sep 24, 1978
- completed
- 0
- cumulative oil, bbl
- 225K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 24, 1978
- Shut in
- —
- Plugged
- Mar 10, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Buelow G-14-78916 | Texas Hugoton | Conocophillips Company | 1 | 0 | 225K | Jan 1993 – May 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Phillips Petroleum CompanyJan 1993 → Dec 2002
- 2Conocophillips CompanyJan 2003 → May 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 22215-99 | Drill | Phillips Petroleum Company | Apr 14, 1978 | Apr 14, 1978 | Apr 17, 1978 | 2,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 24, 1978 | Buelow G-14-78916 | Texas Hugoton | Conocophillips Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,750 | 2,800 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,702 | — | 750 S |
| 4.5 | 2,881 | — | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-421-30211 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-421-30211 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42130211, documented in the API reference.