TEXAS · WELLS · SHERMAN COUNTY · FEDRIC LEASE · API 42-421-30646 · DISTRICT 08

Fedric #2

Y

Sherman County · Texas Hugoton field · Producing  · Vertical

Fedric #2 (API 42-421-30646) is a well in Sherman County operated by Pantera Energy Company, completed June 25, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 27, 1997, permitted to 3,301 ft.

It was permitted by BP America Production Company and has since transferred to Pantera Energy Company on the wellbore schedule.

Completion filings report one formation top, including Brown Dolo..

Its lease has reported 8 barrels of oil and 835K mcf of gas since May 1997, last reporting volume in April 2026.

Operator of record

Pantera Energy Company

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Amarillo, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
359
Phone
(806) 376-6625

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Apr 2026
Latest permitBP America Production CompanyJan 27, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,301
total depth, ft
2
permits on file
Jan 27, 1997
last permit issued
Jun 25, 1997
completed
8
cumulative oil, bbl
835K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 25, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fedric G-14-164702Texas HugotonPantera Energy Company18835KMay 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 8,946 · prior 12 12,360(-28%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crescendo Resources, L.P.Jun 1997 → Mar 2000
  2. 2Amoco Production CompanyApr 2000 → Dec 2001
  3. 3BP America Production CompanyJan 2002 → Sep 2014
  4. 4Pantera Energy CompanyOct 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
457591-98DrillBP America Production CompanyJan 30, 2007Jan 27, 1997Jun 4, 19973,300
457591-99DrillMidgard Energy CompanyJan 21, 1997Jan 27, 1997Jun 4, 19973,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 25, 1997Fedric G-14-164702Texas HugotonPantera Energy CompanyProducing3,301

Formation tops

As filed on W-2/G-1. Subsea from 3,533 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolo.2,936597

Perforations

Perforated and open-hole intervals.

FromToType
2,8753,301Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37553617.5610 S
8.6252,91312.25995 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 14, 1997Aug 29, 1997Yes
00Oct 10, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42130646, documented in the API reference.