TEXAS · WELLS · SHERMAN COUNTY · KEENER ET AL LEASE · API 42-421-30702 · DISTRICT 08

Keener et Al #2

Y

Sherman County · Texas Hugoton field · Producing  · Vertical

Keener ET AL #2 (API 42-421-30702) is a well in Sherman County operated by Pantera Energy Company, completed February 21, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 30, 1998, permitted to 3,024 ft.

It was permitted by BP America Production Company and has since transferred to Pantera Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Tubb, Red Cave, Pan Lm, B Dol.

Its lease has reported 8 barrels of oil and 116K mcf of gas since February 1999, last reporting volume in April 2026.

Operator of record

Pantera Energy Company

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Amarillo, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
359
Phone
(806) 376-6625

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePantera Energy Company
Production reportsPantera Energy Companythrough Apr 2026
Latest permitBP America Production CompanySep 30, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,024
total depth, ft
2
permits on file
Sep 30, 1998
last permit issued
Feb 21, 1999
completed
8
cumulative oil, bbl
116K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 21, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Keener et Al G-14-172568Texas HugotonPantera Energy Company18116KFeb 1999 – Apr 2026

Gas, mcf lease total

Last 12 months 1,854 · prior 12 2,170(-15%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crescendo Resources, L.P.Feb 1999 → Mar 2000
  2. 2Amoco Production CompanyApr 2000 → Dec 2001
  3. 3BP America Production CompanyJan 2002 → Sep 2014
  4. 4Pantera Energy CompanyOct 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
479768-98DrillBP America Production CompanyApr 17, 2007Sep 30, 1998Dec 2, 19983,000
479768-99DrillCrescendo Resources, L.P.Sep 29, 1998Sep 30, 1998Dec 2, 19983,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 21, 1999Keener et Al G-14-172568Texas HugotonPantera Energy CompanyProducing3,024

Formation tops

As filed on W-2/G-1. Subsea from 3,598 ft elevation.Download CSV →

FormationMD ftSubsea
Tubb1,8561,742
Red Cave1,9401,658
Pan LM2,608990
B Dol2,795803

Perforations

Perforated and open-hole intervals.

FromToType
2,7953,024Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551812.25300 S
5.52,6917.875260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 6, 1999Apr 7, 1999Yes
00Apr 29, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42130702, documented in the API reference.