TEXAS · WELLS · SHERMAN COUNTY · HOSPITAL B LEASE · API 42-421-30783 · DISTRICT 08

Hospital B #2

Shut in

Sherman County · Palo Duro Creek (Marmaton) field · Temp Abandoned  · Vertical

Hospital B #2 (API 42-421-30783) is a well in Sherman County operated by Burk Royalty CO. Ltd., completed November 14, 2000 and listed as temp abandoned on the RRC schedule, shut in December 1, 2023.

The RRC has issued one drilling permit, issued September 13, 2000, permitted to 5,650 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Completion filings report 6 formation tops, including Base Stne Corral, Panhandle Lime, Anhydrite Marker, Cleveland.

Its lease has reported 634 barrels of oil and 43.2K mcf of gas since November 2000, last reporting volume in November 2023.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
384
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsBurk Royalty Co., Ltd.through Nov 2023
Latest permitPhillips Petroleum CompanySep 13, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,650
total depth, ft
1
permits on file
Sep 13, 2000
last permit issued
Nov 14, 2000
completed
634
cumulative oil, bbl
43.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2000 THROUGH Nov 2023

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 14, 2000
Shut in
Dec 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hospital B G-14-181091Palo Duro Creek (Marmaton)Burk Royalty Co., Ltd.163443.2KNov 2000 – Nov 2023

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyDec 2000 → Aug 2002
  2. 2Scout Energy Management LLCNov 2023 → Nov 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
499483-99DrillPhillips Petroleum CompanySep 11, 2000Sep 13, 2000Sep 23, 20005,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 14, 2000Hospital B G-14-181091Palo Duro Creek (Marmaton)Burk Royalty Co. Ltd.Temp Abandoned · shut in Dec 1, 20235,650

Formation tops

As filed on W-2/G-1. Subsea from 3,386 ft elevation.Download CSV →

FormationMD ftSubsea
Base Stne Corral1,7301,656
Panhandle Lime2,493893
Anhydrite Marker2,837549
ClevelandCLEVELAND SHALE5,150-1,764
Marmaton5,402-2,016
Cherokee5,552-2,166

Perforations

Perforated and open-hole intervals.

FromToType
5,4025,436Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,69112.25800 S
5.55,6157.875135 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 17, 2001Jan 31, 2001Yes
00Mar 8, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42130783, documented in the API reference.